Laserfiche WebLink
3. <br />material designation of PE 3408, with an ASTM D3350 cell classification of 34544C. The <br />pipe shall be black in color, containing approximately 2 percent U.V. stabilizer. The pipe <br />shall be co -extruded with a color coded sheath or have three (3) sets of colored lines at the <br />120° quadrants. The pipe shall be designed for a working pressure of 160 psi. Pipe shall be <br />extruded to the minimum wall thickness described in AWWA C906 for DRI 1. Pipe outside <br />dimensions shall meet that of ductile iron pipe size (D.I.P.S.). Pipe shall be provided in <br />nominal 40 foot long sections. <br />During the extrusion process, the HDPE pipe shall be continuously marked with durable <br />printing including the following information: <br />1) Nominal Size <br />2) Dimension Ratio <br />3) Manufacturer Name and Product Series <br />4) Cell Class <br />5) ASTM Basis <br />6) Pipe Test Category <br />7) Plant Identification <br />8) Production Date <br />B. Fittings <br />HDPE fittings shall be in accordance with ASTM D 3261 and shall be manufactured by <br />injection molding, a combination of extrusion and machining, or fabricated from HDPE pipe <br />conforming to this specification. The fittings shall be designed for a working pressure of <br />160 psi. The fittings shall be manufactured from the same resin type and cell classification <br />as the pipe itself. The fittings shall be homogeneous throughout and free from cracks, holes <br />foreign inclusions, voids, or other injurious defects. All fittings shall be constructed to have <br />a minimum D.R. 11 sidewall thickness, with a D.I.P.S. outside diameter. <br />C. Joints <br />Sections of polyethylene pipe shall be joined at the job site by the butt fusion process into <br />one continuous length. The joining process shall be the heat fusion method and shall be <br />performed in strict accordance with the pipe manufacturer's recommendations. The heat <br />fusion equipment used in the joining procedures should be capable of meeting all conditions <br />recommended by the pipe manufacturer. <br />EXECUTION OF WORK <br />Installation of the polyethylene pipeline shall be conducted using "medi" — HDD or "maxi" — HDD <br />equipment of intermediate size and capabilities. 'The installation guidelines and practices governing <br />this installation shall follow that of the "maxi" — HDD category rather than "mini" — HDD practices. <br />A. Preparation <br />1) Clearing — The CONTRACTOR shall perform all clearing necessary, where <br />applicable for the proper installation of the pipe at the locations shown on the <br />drawings. Plantings, shrubbery, trees, utility poles or structures subject to damage <br />02400 - 4 02400 — Directional Bore Crossings <br />