Laserfiche WebLink
SECTION 02900 <br /> SURFACE RESTORATION <br /> 1 . SCOPE <br /> A. General <br /> 1 ) The work to be performed under this item shall include the selling and <br /> delivering and the completing of "off-site" surface restoration as specified <br /> herein. Final surface restoration shall follow completion of acceptable testing <br /> results within 10 calendar days . However, in no case shall the area of <br /> construction be allowed to remain unrestored more than 30 days after the <br /> start of excavation. <br /> Be References <br /> 1 ) Florida Department of Transportation Standard Specifications for Road and <br /> Bridge Construction, 2000 Edition. <br /> a. FDOT Section 320 - Hot Bituminous Mixtures - Plant, Methods and <br /> Equipment. <br /> b. FDOT Section 332 - Type II Asphaltic Concrete. <br /> c. FDOT Section 912 - Sand-Clay Base Material <br /> d. FDOT Section 913 - Shell Material <br /> e. FDOT Section 915 - Cemented Coquina Shell Material <br /> 2) American Association of State Hi hghway and Transportation Officials <br /> AASHTO <br /> a. AASHTO T- 180 - Test for Moisture-Density Relations of Soils using <br /> a 10 lb. Rammer and an 18-inch Drop . <br /> 2 , MATERIALS <br /> A. Base Course for Paved Surfaces <br /> 1 ) The base course shall comply with Section 02722 of these Specifications <br /> A. Final Asphaltic Surface Course <br /> 2) Asphalt surface course shall comply with Section 027421 of these <br /> Specifications. <br /> 02670 — Off-site Surface Restoration <br /> 02670 - 1 <br />