My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (8)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:48:14 AM
Creation date
10/1/2015 12:22:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7475
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . 8 STAINLESS-STEEL FINISHES <br /> A. Remove tool and die marks and stretch lines, or blend into finish. <br /> B . Dull Satin Finish: No . 6 . <br /> C . When polishing is completed, passivate and rinse surfaces. Remove embedded foreign matter and leave <br /> surfaces chemically clean. <br /> PART 3 - EXECUTION <br /> bw <br /> 3 . 1 EXAMINATION <br /> 3 .2 INSTALLATION, GENERAL <br /> A. Fit exposed connections together to form tight, hairline joints . <br /> B . Perform cutting, drilling, and fitting required for installing railings . Set railings accurately in location, <br /> alignment, and elevation; measured from established lines and levels and free of rack. <br /> 1 . Do not weld, cut, or abrade surfaces of railing components that have been coated or finished after <br /> fabrication and that are intended for field connection by mechanical or other means without further <br /> cutting or fitting. <br /> 2 . Set posts plumb within a tolerance of 1 / 16 inch in 3 feet (2 mm in 1 m) . <br /> 3 . Align rails so variations from level for horizontal members and variations from parallel with rake <br /> of steps and ramps for sloping members do not exceed 1 /4 inch in 12 feet (5 mm in 3 m) . <br /> Co Corrosion Protection: Coat concealed surfaces of aluminum that will be in contact with grout, concrete, <br /> masonry, wood, or dissimilar metals, with a heavy coat of bituminous paint. <br /> D . Adjust railings before anchoring to ensure matching alignment at abutting joints . <br /> E. Fastening to In-Place Construction: Use anchorage devices and fasteners where necessary for securing <br /> railings and for properly transferring loads to in-place construction. <br /> 3 .3 RAILING CONNECTIONS <br /> A. Welded Connections : Use fully welded joints for permanently connecting railing components . Comply <br /> with requirements for welded connections in "Fabrication" Article whether welding is performed in the <br /> shop or in the field. <br /> B . Expansion Joints : Install expansion joints at locations indicated but not farther apart than required to <br /> accommodate thermal movement. Provide slip joint internal sleeve extending 2 inches (50 mm) beyond <br /> joint on either side, fasten internal sleeve securely to one side, and locate joint within 6 inches ( 150 mm) <br /> of post. <br /> y <br /> L <br /> Wabasso Beach Park 05521 - 6 <br /> Indian River County <br /> DAA Project No . 6008 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.