My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-227
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2016 12:23:31 PM
Creation date
9/30/2015 8:54:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
06/21/2005
Control Number
2005-227
Agenda Item Number
14.B.2
Entity Name
GeoSyntec Consultants
Subject
Vertical Expansion - Class 1 Landfill Work Authorization No.02
Area
IRC Sanitary Landfill Facility
Supplemental fields
SmeadsoftID
5037
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoSyntec Consultants <br /> Ms . Polly Kratman <br /> Indian River County <br /> 7 June 2005 <br /> Page 5 <br /> Task 2 — Design and Permit Application <br /> GeoSyntec will design and then prepare and submit the permit application to FDEP <br /> for the vertical expansion of the Class I Landfill . The design will include the <br /> engineering analyses to demonstrate that the vertical expansion complies with the <br /> specific requirements of Rule 62 - 701 . 430 , F . A. C . The following activities will be <br /> performed to design the vertical expansion and prepare the permit application : <br /> • review the existing permit application and other relevant reports and <br /> documents, including correspondence with FDEP ; <br /> • review geotechnical and hydrogeologic investigations performed at the site and <br /> within the footprint of the proposed expansion for relevant data that will be <br /> used for the engineering analyses required for the expansion permit <br /> application ; <br /> • meet with FDEP to discuss the proposed expansion, including the proposed <br /> liner system and permitting approach (this will be performed as part of Task 1 ) ; <br /> • design the liner system for the unlined part of the vertical expansion and <br /> evaluate the performance to comply with Rule 62 - 701 .430 ( 1 ) (a) , F . A. C . ; <br /> • design the leachate management system for the expansion area, including <br /> relocation of the existing lift station that will be impacted by the vertical <br /> expansion ; <br /> • design the top elevation and final cover configuration for the proposed <br /> expansion to meet the disposal capacity needs of IRC , and at least comply with <br /> those proposed in the updated Master Plan ; <br /> • perform hydrologic and hydraulic analysis for extreme rainfall events and <br /> design the surface-water management system for the expansion area, including <br /> control features to separate surface water from leachate during construction and <br /> operation of the vertical expansion areas ; <br /> XL05065VLA50010-final <br />
The URL can be used to link to this page
Your browser does not support the video tag.