My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-021
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 11:55:58 AM
Creation date
9/30/2015 7:39:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/04/2005
Control Number
2005-021
Agenda Item Number
14.B.1
Entity Name
WCG/Neel-Schaffer
Subject
Solid Waste Disposal District (SWDD) Work Order No.1
Solid Waste Management Master Plan Update
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
3852
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 1: Kickoff Meeting and Project Control Plan <br />The Consultant will meet with SWDD Manager and staff to discuss the project goals and <br />deliverables, establish communication protocol and to obtain available data from the County. At <br />the kickoff meeting, background data, project reports and other pertinent information available <br />from the County will be collected. The Consultant will prepare and submit to SWDD at the <br />kickoff meeting a project control plan that will define the project team and responsibility, lines of <br />communication, scheduled progress meetings with SWDD staff and the UAC, milestones and a <br />specific list of deliverables and deliverable schedule. Quality control management will be <br />addressed in the document. SWDD staff comments will be incorporated in the draft document <br />and the final copy will be distributed to all team members. Throughout the duration of the project <br />if deviation is necessary in the project scope of work or the project scheduling, the Consultant will <br />notify SWDD Manager specifying the reason for such deviation. Once approved by SWDD, the <br />revised schedule will then constitute the agreed-upon schedule for performance of the remaining <br />activities. However, in no event shall the Consultant perform work outside of the approved scope <br />of work without written authorization from SWDD. The Consultant will prepare the kick-off <br />meeting notes for distribution to the project team and attendees within one week following the <br />meeting. <br />Task Deliverable: Deliverables under this task are the draft and final Project Control Plan and <br />meeting notes. <br />Task 2: Background Data Collection and Updating Planning Projections <br />The Consultant will collect the existing available documents, data and other information from <br />SWDD related to landfill and drop-off facilities including updated topographic and aerial surveys, <br />current solid waste flow and remaining disposal capacities, capital equipment and maintenance <br />facilities, personnel and administration, and status of existing permits and renewal schedules. The <br />Consultant will visit the existing facilities to evaluate the present conditions. This will include site <br />visits and evaluations of the solid waste drop-off centers, solid waste processing facilities, Class I <br />landfill, Construction & Demolition (C&D) debris disposal facilities, solid waste recycling and <br />household hazardous waste collection center, and other facilities. <br />The Consultant will utilize the information from the Master Plan and collect from the County <br />updated data prepared by other Consultants related to solid waste flow quantities and waste <br />categories. The Consultant will collect the updated planning, development and population <br />projection data from the SWDD and will use this data for preparation of solid waste projections <br />and capacity requirements. The Consultant will schedule a meeting with other Consultants to <br />collect other available updated information related to surface water management system and on- <br />going ERP application and other drainage permitting. <br />The Consultant will utilize the existing data to prepare an update of the solid waste flow <br />projections for the duration of the useful life of the acquired land. This will include projections <br />and breakdown of the projected solid waste flow quantities requiring disposal in the Class I and <br />C&D landfills. Based on this projection, the Consultant will identify the disposal and operations <br />processing needs and regulatory requirements for the duration of the planning period. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.