Task Deliverable: The Consultant will prepare a Technical Memorandum (TM- 1 ) reporting the <br /> results of this Task and present an updated evaluation of the system conditions, population and <br /> solid waste quantity projections, the estimated remaining landfill disposal capacities for both <br /> Class I and C&D landfills, and present other updated information and evaluations of the solid <br /> waste processing, transferring, recycling and disposal programs . <br /> Task 3- Update of Landfill Facility Build-out Develoyment Plan <br /> Based on the results of TM4 , the Consultant will prepare an update of the County landfill facility <br /> development plan. The Consultant will develop a planning level drawing showing the existing <br /> landfill site and acquired Property at build-out. This build-out development plan will show <br /> conceptually the overall areas for Class I and C&D landfills, stormwater ponds, and ancillary <br /> facilities and areas for solid waste operational needs. The Consultant will prepare planning level <br /> cross-sections of the proposed disposal areas showing existing and proposed grades for use as a <br /> guide to estimate the potential capacity of the proposed disposal cells . An estimate of landfill life <br /> expectancy will be developed based on the updated solid waste quantity projections. It is assumed <br /> the County will continue to manage C&D debris in a separate landfill from Class I solid waste <br /> landfill . The Consultant will utilize existing information regarding stormwater management and <br /> wetland mitigation as designed and prepared by other consultants in preparation of the build-out <br /> plan drawing. <br /> Task Deliverable: The Consultant will prepare a Technical Memorandum (TM-2) reporting the <br /> results of this Task and present an updated drawing for the landfill facility development plan at <br /> build-out along with cross-sections and potential disposal capacity calculations for each cell . <br /> Task 4 — Update of Capital Improvement Program <br /> The Consultant will update the capital improvement program based on the identified needs to <br /> achieve the objectives of the updated solid waste Master Plan. The Consultant will prepare <br /> preliminary probable cost estimates of facilities expansions, improvements and capital equipment <br /> identified in the updated CIP . A time and priority schedule will be provided for implementation of <br /> the recommended Capital Improvement Program. <br /> Task Deliverable: The Consultant will prepare a Technical Memorandum (TM-3 ) reporting the <br /> results of this Task and present an updated CIP along with cost estimates and an updated schedule <br /> for implementation. <br /> Task 5 — Update of Solid Waste Master Plan Report <br /> The Consultant will combine the results of TM- 1 , TM-2 and TM- 3 into one report and prepare a <br /> condensed executive summary report regarding future needs and requirements, and summarize <br /> findings and recommendations of the updated CIP . The Report of updated Master Plan will <br /> include updated discussion of the following component of the System : <br /> 1 . Solid waste drop-off areas and transfer system & management . <br /> 5 <br />