Task Deliverable: The Consultant will prepare a Technical Memorandum (TM -1) reporting the <br />results of this Task and present an updated evaluation of the system conditions, population and <br />solid waste quantity projections, the estimated remaining landfill disposal capacities for both <br />Class I and C&D landfills, and present other updated information and evaluations of the solid <br />waste processing, transferring, recycling and disposal programs. <br />Based on the results of TM -1, the Consultant will prepare an update of the County landfill facility <br />development plan. The Consultant will develop a planning level drawing showing the existing <br />landfill site and acquired Property at build -out. This build -out development plan will show <br />conceptually the overall areas for Class I and C&D landfills, stormwater ponds, and ancillary <br />facilities and areas for solid waste operational needs. The Consultant will prepare planning level <br />cross-sections of the proposed disposal areas showing existing and proposed grades for use as a <br />guide to estimate the potential capacity of the proposed disposal cells. An estimate of landfill life <br />expectancy will be developed based on the updated solid waste quantity projections. It is assumed <br />the County will continue to manage C&D debris in a separate landfill from Class I solid waste <br />landfill. The Consultant will utilize existing information regarding stormwater management and <br />wetland mitigation as designed and prepared by other consultants in preparation of the build -out <br />plan drawing. <br />Task Deliverable: The Consultant will prepare a Technical Memorandum (TM -2) reporting the <br />results of this Task and present an updated drawing for the landfill facility development plan at <br />build -out along with cross-sections and potential disposal capacity calculations for each cell. <br />Task 4 — Update of Capital Improvement Program <br />The Consultant will update the capital improvement program based on the identified needs to <br />achieve the objectives of the updated solid waste Master Plan. The Consultant will prepare <br />preliminary probable cost estimates of facilities expansions, improvements and capital equipment <br />identified in the updated CIP. A time and priority schedule will be provided for implementation of <br />the recommended Capital Improvement Program. <br />Task Deliverable: The Consultant will prepare a Technical Memorandum (TM -3) reporting the <br />results of this Task and present an updated CIP along with cost estimates and an updated schedule <br />for implementation. <br />Task 5 — Update of Solid Waste Master Plan Report <br />The Consultant will combine the results of TM -1, TM -2 and TM -3 into one report and prepare a <br />condensed executive summary report regarding future needs and requirements, and summarize <br />findings and recommendations of the updated CIP. The Report of updated Master Plan will <br />include updated discussion of the following component of the System: <br />1. Solid waste drop-off areas and transfer system & management. <br />5 <br />