Laserfiche WebLink
B. Final Design Phase <br />Task I - Drawings and Engineering <br />This task consists of the engineering and the development of plans necessary to construct this project. <br />A. Prepare detailed drawings for the proposed work discussed previously within this Exhibit. A <br />tentative list of final design drawings to be developed for this project is presented in Table 1. <br />Drawings will be prepared using drafting standards and standard details as developed by <br />ARCADIS unless standards are provided by CLIENT. <br />Task 2 - Specification Preparation <br />A. Prepare Standard EJCDC (1996 Edition) Contract Forms, Bidding Documents and Contract <br />Conditions required for this project unless standards are provided by CLIENT. <br />Prepare technical specifications required for this project in using Construction Specifications <br />Institute (CSI) format Division 1 through Division 16. A tentative list of specification <br />sections to be prepared for this project is presented in Table 2. <br />Task 3 - Permit Preparation Assistance <br />This task consists of the preparation of a construction permit application submittal for the Florida <br />Department of Environmental Protection (FDEP) and the Indian River County Building Department. <br />A submittal shall also be prepared for the site plan and Development Review process for the vacuum <br />pump station. This task shall consist of attendance at a pre -application meeting, a site plan <br />application, two (2) meetings, and responses to comments. <br />Any additional permits required beyond the above will be considered as outside the scope of this <br />proposal. All permit fees shall be paid by CLIENT. <br />Task 4 - Final Opinion of Probable Construction Cost <br />Prepare the final opinion of probable construction cost for all new facilities and improvements <br />proposed under this project following completion of design. <br />Task 5 - Bidding Assistance Services <br />This task shall include work necessary to assist the CLIENT with the bidding of this project. This <br />work may include the following: <br />A. Attend a pre-bid meeting at CLIENT's facilities. <br />p� Page 2 of l7 <br />