Laserfiche WebLink
Task 3 - Review Shop Drawings <br />Review Shop Drawings and samples, the results of tests and inspections, and other data submitted by <br />the Contractor in accordance with the Contract Documents. <br />Task 4 - Review Pay Requests and Schedules <br />Review monthly pay requests and make recommendations for payment to CLIENT. Monthly pay <br />requests will be reviewed in the field and an agreement reached between the Contractor and <br />ARCADIS' project representative(s), prior to formal submittal to CLIENT for payment. Review the <br />Contractor's preliminary and monthly progress schedules through completion. <br />Task 5 - Perform Periodic and Milestone Inspections <br />With regard to the vacuum pump station; perform inspections to determine that the project has <br />achieved Substantial Completion and readiness for Final Acceptance and that the Work has been <br />completed in general conformance with the Contract Documents to certify completion of construction <br />to permitting agencies and to perform startup services of the vacuum pump station. Six (6) such site <br />visits are anticipated. CLIENT's staff should be available for training during the startup process, as the <br />manufacturer's formal training program is not scheduled to be utilized at this time. <br />Task 6 - Progress Meetings <br />Attend nine (9) monthly construction related progress meetings. ARCADIS will preside over and <br />generate and distribute minutes of these meetings. The purpose of these meetings is to formally <br />coordinate the activities of the Contractor and CLIENT to resolve any conflicts and to review working <br />procedures as required to satisfactorily complete the project. <br />Task 7 - Contract Modifications <br />Develop the necessary data, notes and clarification drawings required to prepare contract <br />modifications to reflect adjustments to the construction project. Two (2) owner requested contract <br />modifications incorporating a total of six items, is the level of effort basis for this budget item. One of <br />the contract modifications will be the final reconciliation contract modification prepared at the end of <br />the project to equate the final units which were estimated in the bid form to the final number of units <br />installed. <br />When CLIENT requests additional contract modifications, ARCADIS' fee may be adjusted <br />accordingly based on a mutually agreed amount. <br />Task 8 - Project Closeout <br />Review the Contractor's as -built drawing information which shows the work as it was constructed. <br />ARCADIS shall prepare record drawings based on Contractor's field data and provide the CLIENT an <br />electronic set of record drawings in AutoCadd and a set of prints showing those changes made during <br />the construction process based upon information provided by the Contractor. <br />Attend the final project reconciliation meeting with CLIENT and the Contractor <br />Page 4 of 17 <br />