Laserfiche WebLink
4. Preliminary Site Plan and Calculations - Develop preliminary site plan conforming to <br /> Section 20 of the City of Fellsmere LDR showing existing site conditions, right-of-ways and <br /> easements, proposed site improvements and stormwater tracts . Provide dimensional data and <br /> develop site data calculations . Prepare an initial phasing plan identifying separation methods <br /> and scheduling between areas of new construction, areas to remain in service during <br /> construction and final implementation and demolition. Complete and submit application for <br /> initial site plan review. <br /> 5 . Preliminary Stormwater Management Plan - Develop an on-site conceptual stormwater plan <br /> showing preliminary location of conveyance system, stormwater treatment and outfall <br /> structures. Set preliminary grades for concrete flatwork, paving and drainage improvements. <br /> 6 . Landscaping — Identify trees to remain and designate for tree protection. Determine buffer <br /> areas required on-site. Select buffer/screening method(s) and landscape vegetation scheme. <br /> 7 . Technical Review Committee Meeting - Attend Technical Review Committee (TRC) <br /> meeting of the initial site plan review. Meet with SWDD staff to review, discuss and <br /> determine appropriate response to TRC comments. <br /> TASK 4 — SITE PLAN APPROVAL <br /> 1 . Site Plan Application and Submittals - Revise preliminary site plan per comments of initial <br /> TRC review. Conduct final site design and prepare plans conforming to City of Fellsmere <br /> land development requirements showing all proposed site improvements. Show final <br /> dimensional and site data calculations. Prepare all accompanying exhibits and submittals <br /> required for site plan review. Complete and submit applications for site plan approval . <br /> 2 . Stonnwater Management Design and Report - Prepare stormwater management report to <br /> include: flood routings; treatment type and sizing; discharge calculations; and recovery <br /> analysis. Prepare drawings showing stormwater drainage control devices, structures and <br /> treatment measures. Design stormwater system conforming to Section 20-30 of the City of <br /> Fellsmere LDR and Florida Administrative Code, Chapter 40C-40 (project with less than 1 <br /> acre of wetlands). <br /> 3 . Water and Wastewater Service - Develop plan to extend existing water service to new site <br /> facilities. Prepare design report and plans for wastewater service to the new site facilities as <br /> required by Section 78 of the City of Fellsmere Code of Ordinances. <br /> 4. Landscaping — Refine the conceptual landscape design created initially in Task 3 to comply <br /> with Section 20-28 of the City of Fellsmere LDR and current Comprehensive Plan . <br /> Coordinate landscaping requirements with site plan development to provide appropriate <br /> grading and location for landscape buffers and strips; opaque features ; tree wells ; fencing <br /> and gates; and irrigation facilities. Locate and calculate final vegetation quantities. <br /> S104t0774ndian River County SWDDTellsmere Convenience CenterWttachment Ldoc Page 3 of 8 <br />