My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-265
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2016 11:10:14 AM
Creation date
9/30/2015 9:00:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/02/2005
Control Number
2005-265
Agenda Item Number
11.I.2
Entity Name
Peninsula Hydrologic Data Specialists, Inc.
Subject
East Roseland Stormwater Improvement Project
Work Order No.1 Stormwater Samples
Area
Roseland Pond
Supplemental fields
SmeadsoftID
5114
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Roseland QAPP <br /> Section B <br /> Revision No . _ <br /> Date : 11 / 16/04 <br /> Page 20 of 22 <br /> QC checks will be performed throughout the project to ensure the generation of <br /> reliable data . The equipment will be calibrated and programmed prior to <br /> installation at the project site and a record of the calibration will be recorded in <br /> the field logs . The automated samplers will be checked periodically and after <br /> each rainfall event to ensure proper function . <br /> Two equipment blanks will be taken during initial post-construction set- up using <br /> laboratory-supplied deionized water and adhering to the procedures outlined in <br /> FDEP SOPs . <br /> B6 . Instrument/Equipment Testing , Inspection & Maintenance <br /> The equipment will be checked periodically and after every rainfall event to <br /> ensure proper function . Maintenance will be performed if necessary . These <br /> activities will be recorded in the field log . Laboratory equipment will be tested <br /> and maintained according to the requirements outlined in the Laboratory SOPs , <br /> B7 . Instrument Calibration and Frequency <br /> The equipment will be programmed and calibrated prior to installation at the <br /> Project site according to manufacturers guidelines (America Sigma Model 900 <br /> MAX) and a record of the calibration will be kept with the equipment and <br /> recorded in the field log . Laboratory equipment will be calibrated according to the <br /> requirements outlined in the Laboratory SOPs . <br /> B8 . Inspection/Acceptance Requirements for Supplies <br /> The equipment (tubing , autosamplers , sample bottle , flow meter) will be visually <br /> inspected by Michael Wickwire to ensure proper function and recorded in the <br /> field log . <br /> B9 . Data Acquisition Requirements for Non -direct Measurements <br /> No data from non -direct measurements is planned for this project . <br /> B10 . Data Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.