My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-265
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2016 11:10:14 AM
Creation date
9/30/2015 9:00:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/02/2005
Control Number
2005-265
Agenda Item Number
11.I.2
Entity Name
Peninsula Hydrologic Data Specialists, Inc.
Subject
East Roseland Stormwater Improvement Project
Work Order No.1 Stormwater Samples
Area
Roseland Pond
Supplemental fields
SmeadsoftID
5114
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Roseland QAPP <br /> Section B <br /> Revision No . _ <br /> Date : 7/23/04 <br /> Page 21 of 22 <br /> Data ( pH , temperature , dissolve oxygen and salinity ) collected in the field by <br /> Michael Wickwire will be recorded in a field log and then transferred into an Excel <br /> spreadsheet . Data received from U . S . Biosystems , Inc . will also be entered into <br /> the Excel spreadsheet in order to process , compile and analyze the data . Keith <br /> McCully will review the data entry . The Excel spreadsheet will be backed up <br /> each night onto a security system . <br /> Any tables or graphs generated for the data report package from the spreadsheet <br /> will accompanied by : <br /> 1 . raw data ( laboratory reports ) <br /> 2 , field logs <br /> 3 , automatic sampler information <br /> 4 , problems encountered <br /> [The remainder of this page was left blank intentionally] <br />
The URL can be used to link to this page
Your browser does not support the video tag.