Himanshu Mehta, P . E . <br /> 7 September 2007 <br /> Page 3 <br /> Phase 2 — Injection and Monitoring Well Installations <br /> Phase 2 includes the activities associated with providing oversight to drilling subcontractors, as <br /> required, to install the proposed injection well network and the FDEP -requested off-site <br /> monitoring well to be located on the Cathco, Inc. property. The proposed drilling will include <br /> the following : <br /> • Transect One: Twenty-two, 1 -inch diameter injection wells screened from 40 to 50 ft <br /> below land surface (BLS) will be located in the current infiltration gallery. Eight of the <br /> original "vertical head dissipation wells" will be converted to injection wells, and 14 new <br /> injection wells will be installed . The injection wells will be completed with 2 ft by 2 ft by <br /> 4-inch thick concrete pads, 8-inch steel manholes, and locking caps. The injection wells <br /> will be installed using direct-push drilling techniques . <br /> • Transect Two : Twenty-three, 1 -inch diameter injection wells screened from 40 to 50 ft <br /> BLS will be installed along a transect in proximity to monitoring well MW07 . The wells <br /> will be spaced at approximately 6 . 6 ft to provide a continuous treatment barrier. The <br /> injection wells will be completed with 2 ft by 2 ft by 4-inch thick concrete pads, 8-inch <br /> steel manholes, and locking caps . The injection wells will be installed using direct-push <br /> drilling techniques . <br /> • Transect Three: Thirty-two, 1 -inch diameter injection wells screened from 40 to 50 ft BLS <br /> will be installed along a transect in proximity to monitoring well MW28B (located on IRC <br /> Sheriffs Department Firing Range). The wells will be spaced at approximately 8 . 9 ft to <br /> provide a treatment barrier. The injection wells will be completed with 2 ft by 2 ft by 4- <br /> inch thick concrete pads, 8-inch steel manholes, and locking caps. The injection wells will <br /> be installed using direct-push drilling techniques. <br /> • One, 2-inch diameter by 40 ft total depth monitoring well, with a screened interval from <br /> 30 to 40 ft BLS will be installed using hollow-stem auger drilling techniques at the <br /> Cathco, Inc. property. The monitoring well will be completed with a 2 ft by 2 ft by 4-inch <br /> thick concrete pad, 8-inch steel manhole, and locking cap . The monitoring well will be <br /> developed until visibly free of particulates/solids . <br /> XR07192/CCR07069DOC <br /> engineers I scientists I fnnos,nors <br />