My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-228
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-228
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2016 2:13:22 PM
Creation date
9/30/2015 9:50:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/20/2006
Control Number
2006-228
Agenda Item Number
11.J.1.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No. 13 for South Regional Wastewater Treatment Facility
Supplemental fields
SmeadsoftID
5702
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
information will be submitted along with the application renewal. Maps of the existing and proposed <br /> reuse distribution system with disposal sites which will be submitted with application will be furnished by <br /> IRCU. <br /> Task 4 — Additional Information and Documentation <br /> Additional information for permit renewals (Section 6) will be addressed and submittals prepared for the <br /> application, including a listing and explanation of violations, agricultural use plans (copy of the one <br /> prepared for West Regional WWTF will be submitted), capacity analysis report, binding agreements with <br /> reclaimed water users, and updated operation and maintenance performance report, reclaimed water <br /> quality analysis reports, and technical evaluation of the proposed pretreatment program and limits. <br /> Violations issued in the past will be reviewed with IRCU staff and responses to these will be prepared in <br /> advance of requests for additional information by FDEP. <br /> A copy of the existing up-to-date Agricultural Use Plan for the West Regional WWTF will be reviewed <br /> by Consultant and submitted with application . It is assumed that any updates will be prepared by IRCU' s <br /> contract residuals hauler. <br /> A review of the SRWWTF operations will be performed by consultant as required to prepare a capacity <br /> analysis review in accordance with FAC 62-600.405 . Consultant will prepare an update to the existing <br /> capacity analysis report containing data showing information such as permitted capacity, flows for the last <br /> 10-years, seasonal flow variations, an explanation of the diversion of flows to the west anticipated to <br /> truncate no further increase in flows to this facility, plant loading information, influent and effluent <br /> treatment propterties, existing facility configuration and unit process capacities, and effluent disposal <br /> system. <br /> An update to the operation and maintenance performance report prepared in 2001 will be performed by <br /> Consultant. Consultant will meet with staff to discuss operational issues which need to be addressed with <br /> FDEP, such as elevated TN levels, odor complaints , spills within the last 12 months, CBODs increase, <br /> filamentous control, and TSS/Turbidity correlation . The list of existing reuse sites will be listed, existing <br /> treatment efficiency and potential changes in treatment, performance trends, and effluent water quality. <br /> A review of the proposed industrial pretreatment program will be provided by Consultant under a separate <br /> task. <br /> Task 5 — Industrial Wastewater Contributions and Review of Proposed Industrial Pretreatment <br /> Program and Ordinance <br /> Currently, the industrial pretreatment program and ordinance exist in draft form for IRCU' s wastewater <br /> treatment facilities . IRCU staff is currently working on finalizing their industrial pretreatment program. <br /> Under a separate task, Consultant will provide professional services related to review of documentation <br /> prepared to date, recommendations, and any meetings which may be necessary. <br /> Consultant will address section 5 of the application with regards to the interim industrial pretreatment <br /> program, schedule, and items remaining in its draft form. Information collected to date by IRCU staff on <br /> any significant industrial user discharging to the WWTF will be submitted, including products generated, <br /> flows, waste description, etc. <br /> Consultant will support IRCU staff development of a wastewater pretreatment program by: <br /> Review, comment, and revision support for the Draft Final Sewer Use Ordinance; <br /> EASomh IRCU W WTP Operating Permit Renewal Scope revl .doc <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.