Laserfiche WebLink
information will be submitted along with the application renewal. Maps of the existing and proposed <br /> reuse distribution system with disposal sites which will be submitted with application will be furnished by <br /> IRCU. <br /> Task 4 — Additional Information and Documentation <br /> Additional information for permit renewals (Section 6) will be addressed and submittals prepared for the <br /> application, including a listing and explanation of violations, agricultural use plans (copy of the one <br /> prepared for West Regional WWTF will be submitted), capacity analysis report, binding agreements with <br /> reclaimed water users, and updated operation and maintenance performance report, reclaimed water <br /> quality analysis reports, and technical evaluation of the proposed pretreatment program and limits. <br /> Violations issued in the past will be reviewed with IRCU staff and responses to these will be prepared in <br /> advance of requests for additional information by FDEP. <br /> A copy of the existing up-to-date Agricultural Use Plan for the West Regional WWTF will be reviewed <br /> by Consultant and submitted with application . It is assumed that any updates will be prepared by IRCU' s <br /> contract residuals hauler. <br /> A review of the SRWWTF operations will be performed by consultant as required to prepare a capacity <br /> analysis review in accordance with FAC 62-600.405 . Consultant will prepare an update to the existing <br /> capacity analysis report containing data showing information such as permitted capacity, flows for the last <br /> 10-years, seasonal flow variations, an explanation of the diversion of flows to the west anticipated to <br /> truncate no further increase in flows to this facility, plant loading information, influent and effluent <br /> treatment propterties, existing facility configuration and unit process capacities, and effluent disposal <br /> system. <br /> An update to the operation and maintenance performance report prepared in 2001 will be performed by <br /> Consultant. Consultant will meet with staff to discuss operational issues which need to be addressed with <br /> FDEP, such as elevated TN levels, odor complaints , spills within the last 12 months, CBODs increase, <br /> filamentous control, and TSS/Turbidity correlation . The list of existing reuse sites will be listed, existing <br /> treatment efficiency and potential changes in treatment, performance trends, and effluent water quality. <br /> A review of the proposed industrial pretreatment program will be provided by Consultant under a separate <br /> task. <br /> Task 5 — Industrial Wastewater Contributions and Review of Proposed Industrial Pretreatment <br /> Program and Ordinance <br /> Currently, the industrial pretreatment program and ordinance exist in draft form for IRCU' s wastewater <br /> treatment facilities . IRCU staff is currently working on finalizing their industrial pretreatment program. <br /> Under a separate task, Consultant will provide professional services related to review of documentation <br /> prepared to date, recommendations, and any meetings which may be necessary. <br /> Consultant will address section 5 of the application with regards to the interim industrial pretreatment <br /> program, schedule, and items remaining in its draft form. Information collected to date by IRCU staff on <br /> any significant industrial user discharging to the WWTF will be submitted, including products generated, <br /> flows, waste description, etc. <br /> Consultant will support IRCU staff development of a wastewater pretreatment program by: <br /> Review, comment, and revision support for the Draft Final Sewer Use Ordinance; <br /> EASomh IRCU W WTP Operating Permit Renewal Scope revl .doc <br /> Page 3 of 5 <br />