My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-214
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 2:23:46 PM
Creation date
9/30/2015 10:53:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/10/2007
Control Number
2007-214
Agenda Item Number
11.J.2
Entity Name
Kimley-Horn and Associates
Subject
Work Order No.18 Attachment #1
Central (Gifford) Wastewater Treatment Facility
Area
Central (Gifford) Wastewater Treatment Facility
Supplemental fields
SmeadsoftID
6358
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will prepare draft of application and attend one meeting with IRCU staff to review the <br /> application and collect additional information necessary to complete the application. Consultant will <br /> submit a final draft of application package to IRCU staff for review prior to submission to FDEP. It is <br /> anticipated that the final draft will be submitted to IRCU staff by October, approximately 1 month prior to <br /> submittal date. <br /> The permit application fee of $5,000 will be included under this scope and paid by the Consultant. <br /> Task 2 — Treatment Facility Description <br /> A description of the facility will be prepared, including process flow diagrams, general information, and <br /> design treatment levels. The basis of design flow will be reviewed in order to address remaining capacity <br /> and diverted capacity to this facility from Sea Oaks or North W WTF. <br /> Consultant will prepare an updated PFD showing only existing components and no future expansion of <br /> the facility. <br /> Consultant will review the existing treatment plant hydraulic profile and discuss with staff any know <br /> hydraulic restrictions . The existing hydraulic profile will be used, however, if known restrictions exist, a <br /> new profile can be prepared as an additional service . <br /> Consultant will review the monthly DMR ' s and summarize flow and effluent water quality into a <br /> table/graph which will be included in the permit application. <br /> Task 3 — Reuse and Residuals Disposal Description <br /> Currently, effluent disposal includes 2 .0 mgd AADF slow-rate public access to numerous sites, and 0.4 <br /> mgd AADF rapid rate land application to Bent Pine RIB ' s, all of which are shared between the South, <br /> West, and North Regional W WTF ' s. The existing reuse system allows effluent to also be transmitted to <br /> the West Regional WWTF for disposal to the onsite wetlands . <br /> Consultant will submit updated disposal sites of reuse and incorporate proposed sites. No new discharges <br /> to surface waters or additional wetlands are included under this permit renewal. <br /> It is also assumed that the effluent disposal and reuse water operating protocols already exist as part of <br /> current or new reuse sites. Consultant will review the existing protocol and modify where appropriate <br /> and provide input to any minor modifications or enhancements to IRCU staff. An electronic copy of the <br /> existing protocol will be furnished to Consultant. <br /> Water quality analysis of the effluent will be reviewed as part of its inclusion into the permit application. <br /> A reuse master plan is being updated and completed by others, of which information will be submitted <br /> along with the application renewal . Maps of the existing and proposed reuse distribution system with <br /> disposal sites which will be submitted with application will be famished by IRCU. <br /> Since sludge is hauled from the other wastewater treatment facilities to the Central W WTF, a review of <br /> the data and reports of residual handling and production at this facility should be performed. Consultant <br /> will review the consistency of the residuals production at this facility with the current permitting <br /> requirements. <br /> S:\CVL-ENG\Miller\Indian River County\Proposals\Central IRCU WWTP Operating Permit Renewal Scope - rev2.doc <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.