My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-252
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-252
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2016 3:02:29 PM
Creation date
9/30/2015 9:52:28 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/11/2006
Control Number
2006-252
Agenda Item Number
14.B.2
Entity Name
Neel-Schaffer, Inc.
Subject
Updateing the 2001 Solid Waste Master Plan-work Order #2
Supplemental fields
SmeadsoftID
5739
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 1: Kickoff Meeting and Project Schedule <br /> The Consultant will meet with SWDD Manager and staff to discuss the project schedule and the <br /> revisions to the draft 2005 Solid Waste Master Plan Update Report. At the kickoff meeting, the <br /> task and project deliverables will be discussed. Additional data to be obtained from the County <br /> for the 2006 Update and coordination with other consultants for preparation of Landfill Site Plan <br /> update will be discussed. The Consultant will prepare the kick-off meeting notes for distribution <br /> to the project team and attendees within one week following the meeting. <br /> Task Deliverable: Project schedule update. <br /> Task 2- Revision of Landfill Facility Build-out Development Plan <br /> The Consultant will coordinate with other County consultants to receive the revised Site <br /> Development Plan. The Consultant will attend one (1 ) meeting with the County and other <br /> County consultants during the preparation of the update Site Development Plan. <br /> Based on the results to the updated site plan, the Consultant will prepare estimates of the <br /> proposed disposal area life expectancy based on the updated information provided by the <br /> County and the 2005 Master Plan Update waste quantity projections. It is assumed the County <br /> will continue to manage C&D debris in a separate landfill from Class I solid waste landfill. The <br /> Consultant will utilize existing information regarding stormwater management and wetland <br /> mitigation as designed and prepared by other consultants in preparation of the build-out plan <br /> drawing. <br /> The draft Section 2 will be submitted for SWDD review and comment. The Consultant will meet <br /> with the County to receive comments and finalize the landfill facility build-out development <br /> plan. <br /> Task Deliverable: Revised Section 2 of the Draft 2005 Master Plan Update. <br /> Task 3 - Update of Capital Improvement Program <br /> The Consultant will update the capital improvement program based on the identified needs to <br /> achieve the objectives of the 2006 Solid Waste Master Plan Update . The Consultant will prepare <br /> preliminary probable cost estimates of facilities expansions, improvements and capital <br /> equipment identified in the updated CIP. A Lime and priority schedule will be provided for <br /> implementation of the recommended Capital Improvement Program. <br /> Task Deliverable: Revised Section 3 of the 2005 Solid Waste Master Plan report with updated <br /> CIP and schedule for implementation. <br /> Task 4 - Update of Solid Waste Master Plan Resort <br /> The Consultant will combine the updated Sections and prepare the 2006 updated report <br /> detailing the future needs and requirements, and summarize findings and recommendations of <br /> the updated CIP. The 2006 Master Plan Update Report will include updated discussion of the <br /> following component of the System: <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.