Laserfiche WebLink
The plans will consist of a revised site plan and design figures to be submitted to IRC SWDD <br />and FDEP. A stormwater permit modification will be necessary to alter surface water flows on <br />the site. <br />This project does not anticipate a site plan modification to the IRC Planning and Zoning <br />department. It is assumed the site plan work will be consistent with the modified Master Plan <br />and accepted by the IRC Board of County Commissioners and exempt from the site plan <br />process. <br />We anticipate the following plan sheets to be necessary for this project: <br />■ cover sheet with project location <br />■ site plan survey with boundaries <br />■ construction layout (plan view) <br />a surface water management modifications <br />a sequence of filling <br />■ civil details <br />Subtask 1.2 -Preparation of "Permit To Construct' Application for the Expansion of the C&D <br />Landfill <br />The "permit to construct' application consists of the four page FAC Chapter 62-701.900(6) <br />checklist and all other supporting information. The major information for the permit application <br />are the design plans, operation plan modifications, groundwater monitoring plan modifications, <br />closure plan modifications, and financial assurance documentation revisions. No geotechnical <br />work is anticipated. The application will require the following information as required in Part B <br />of the application. <br />Parts 1 - 7 consists of information regarding the solid wastes being disposed, the site plan <br />showing any adjacent wells near the site, and demonstrate compliance with FAC Chapter 62- <br />701.710(3). <br />Part 8 is a boundary survey and legal description and topographic survey of the property. A <br />prior topographic survey will be used for this purpose and is not a part of this proposal. <br />Part 9 is an operations plan which describes in detail the operations, safety, and training <br />procedures which are used on a daily basis to minimize the risk of environmental degradation. <br />It is expected that some modification of the existing operating plan will be required to <br />incorporate the new phased filling plan. <br />Part 10 is to provide an updated closure plan for the new cell. <br />Part 11 is a requirement to provide financial assurance for closure and for 5 years of long-term <br />care. A detailed closure cost estimate for the C&D Landfill closure and a sinking fund financial <br />analysis to determine revised annual deposits to a landfill closure escrow account based on the <br />remaining airspace must be performed and included in the submittal. CDM will also modify the <br />detailed cost estimate for operation and maintenance cost of the C&D Landfill. The financial <br />responsibility analysis will be submitted to IRC Utilities Department and SWDD for evaluation <br />and comment prior to submittal of the permit application to FDEP due to the financial <br />A-2 mh2431.doc <br />