Laserfiche WebLink
implications of the new construction and post -closure period. The financial assurance <br />documentation will be sent to the FDEP Tallahassee office as part of this application <br />Part 12 is documentation that stormwater is being controlled. A minor modification to the <br />existing Environmental Resource Permit will be required for this task. We expect a letter <br />modification to suffice since no new impervious area is being added to the site. <br />Part 13 is the documentation that the Owner will comply with the recordkeeping requirements <br />of the FAC Chapter 62-701.710(9). <br />The water quality monitoring plan for the site will be modified in the permit application. A <br />comprehensive report describing hydrogeology and the groundwater monitoring system was <br />prepared and submitted in 1998. It is likely that two additional groundwater monitoring well <br />clusters will be required for this expansion. Two clusters with surficial and intermediate wells <br />are planned. <br />Subtask 1.3 - Client Review Meetings <br />CDM will meet with SWDD monthly to keep SWDD informed on the progress of the project <br />and discuss design issues which require client input. The meetings will be held either in CDM's <br />Vero Beach office, at the landfill administrative building, or at the IRC Administrative Complex. <br />CDM will prepare project status reports on the progress of the project and agendas for the <br />project meetings. <br />Subtask 1.4 - Responses to FDEP Request forAdditional Information <br />It is anticipated that the FDEP may request additional information to evaluate the design and <br />supporting permit application material. CDM's budget provides for preparation of one set of <br />responses for additional information under this task. It is anticipated that this will require about <br />30 days depending on the number and complexity of FDEP comments. Responses to FDEP <br />comments will be in the form of letter reports with attached supplemental information. <br />TASK2 - GENERAL SERVICES DURING CONSTRUCTIONAND COMPLETION <br />CERTIFICATION <br />CDM will provide services during construction of the new C&D cell on an as -needed basis. The <br />construction scope of services is based on the estimated time to perform the proposed cell <br />construction. <br />Under this task, CDM will provide general engineering services during construction for the <br />estimated 8 -month construction period on an as -needed basis. General services include project <br />progress meetings, periodic site visits, issue clarifications, final inspections, certification of cell <br />completion, preparation of deviations from the plans, preparation of record drawings, and <br />certification of completion for FDEP. <br />Subtask 2.1 - Services during Construction <br />A. CDM will make visits to the site at intervals appropriate to the various stages of <br />construction to observe the progress and quality of the executed work of the Owner and <br />to determine, in general, if such work is proceeding in an acceptable manner. During <br />such visits and on the basis of on-site observations, CDM shall keep IRC informed of the <br />A-3 mh2431.doc <br />