Laserfiche WebLink
East C ifford QAPP <br /> Section B <br /> Revision No . <br /> Date : 3/ 16/05 <br /> Page 14 of 18 <br /> Biosystems , Inc . The sample handling procedures will adhere to the January 1 , <br /> 2002 DEP-SOP-001 /01 , <br /> B4 . Analytical Methods Requirements <br /> B4 . 1 Analytical Method to be Followed <br /> Measurement to be Made Anal ical Method MDL m /I <br /> 1 . Temperature EPA 170 . 1 N/A <br /> 2 . pH ** EPA 150 . 1 N/A <br /> 3 . Salinity ** EPA 120 . 1 0 . 1 <br /> 4 , Dissolved Oxygen ** EPA 360 . 1 0 . 1 <br /> 5 . Total Kjeldahl Nitrogen EPA 351 . 2 0 . 4 <br /> 6 . Nitrate- N , Nitrite- N EPA 353 . 2 0 . 0052 <br /> Nitrate- N , Nitrite- N EPA 300 . 0 0 . 035 <br /> 7 , Ammonia - N EPA 350 . 1 0 . 0075 <br /> 8 , Total Phosphorus EPA 365 . 1 0 . 0027 <br /> 9 , Color EPA 110 . 2 5 <br /> 10 . Biochemical Oxygen Demand ( BOD ) EPA 405 . 1 0 . 98 <br /> 11 , Total Suspended Solids (TSS ) EPA 160 . 2 2 . 1 <br /> 12 , Alkalinity EPA 310 . 1 43 <br /> ** Field measurement performed by Michael Wickwire of Peninsula hydrologic <br /> Data Specialists , Inc . <br /> The requirements of Chapter 62 -302 , April 9 , 2002 version of the SOPs will be met for <br /> field and analytical activities . <br /> B4 . 2 Validation Information for Non -Standard Methods <br /> Not applicable for this project . <br /> B4 . 3 Individuals Responsible for Corrective Action <br /> 1 . Field Measurements - Michael Wickwire of Peninsula hydrologic Data <br /> Specialists , Inc . <br /> 2 , Laboratory Measurements - Derrick M . Simons of U . S . Biosystems , Inc . <br /> B4 . 4 Special Laboratory Turnaround Time <br /> Not applicable this project . <br /> 135 . Quality Control Requirements <br /> B5 . 1 Purpose/Background <br /> F:\Public Works\KeithM\Stormwater Projects\Gifford East\Water Quality Monitoring Program\Quality Assurance Project Plan\DEP <br /> QAPP East Gifford Revision 3- 16-2005 .doc <br />