My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-209
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 9:37:12 AM
Creation date
9/30/2015 8:51:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/14/2005
Control Number
2005-209
Agenda Item Number
11.I.1
Entity Name
Peninsula hydrologic Data Specialists, Inc.
Subject
East Gifford Stormwater Improvement Project
Work Order No.G-1 post construction stormwater monitoring
Archived Roll/Disk#
4001
Supplemental fields
SmeadsoftID
5011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Gifford QAPP <br /> Section B <br /> Revision No . <br /> Date : 3/ 16/05 <br /> Page 15 of 18 <br /> QC checks will be performed throughout the Project to ensure the generation of <br /> reliable data . The equipment will be calibrated and programmed pr or to <br /> installation at the Project site and a record of the calibration will be recorded in <br /> the field logs . The autosamplers will be checked periodically and after every <br /> rainfall event to ensure proper function . Additionally , Michael Wickwire will <br /> perform the field data collection , sample collection and measurements to ensure <br /> consistency . <br /> Sampling protocols for this project that are not previously stated int e QAPP will <br /> adhere to the 62 -302 April 9 , 2002 version of the SOPs . <br /> B5 . 2 QC and Corrective Action Procedures <br /> If sampling is suspended because the lake depth drops to a predet rmined level <br /> within four hours after initiating sampling and the samplers shut off, Michael <br /> Wickwire will take corrective action and reset the automatic samples and <br /> decontaminate the field equipment . <br /> The laboratory analyses shall be conducted by U . S . Biosystems , Inc . , 3231 NW <br /> 7th Avenue , Boca Raton , Florida 33431 , telephone (888 ) 862 - 5227 . U . S . <br /> Biosystems , Inc . currently operates under NELAC accreditation # E 6240 <br /> expiring on June 30 , 2005 . Laboratory quality control procedures wi I adhere to <br /> the 62 - 160 April 9 , 2002 version of the SOPs . Also , DEP contract calibration <br /> and QC requirements will be followed and Lab certification requirernents for <br /> Sections B6 , B7 , and B8 will be followed . <br /> The types of laboratory control checks that will be used when analyzing samples <br /> for this project are : <br /> Chemical : <br /> o Reagent Blanks <br /> o Matrix Spikes <br /> o Duplicate Samples <br /> o QC Check Samples <br /> 0 Duplicate Matrix Spikes <br /> o QC Check Standards <br /> F :\Public Works\KeithM\Stormwater Projects\Gifford East\Water Quality Monitoring Program\Quality Assurance Project Plan\DEP <br /> QAPP East Gifford Revision 3- 16-2005. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.