Laserfiche WebLink
East Gifford QAPP <br /> Sectio B <br /> Revision No . <br /> Date : 3/ 16/05 <br /> Page 16 of 18 <br /> o Continuing Calibration Standards <br /> Michael Wickwire , Project Quality Assurance Officer, is respo sible for all <br /> necessary corrective action related to sampling and reporting and adhere to the <br /> requirements in the SOPs and DEP-QA-002/02 . <br /> QC checks will be performed throughout the project to ensure the g neration of <br /> reliable data . The equipment will be calibrated and programmed prior to <br /> installation at the project site and a record of the calibration will be recorded in <br /> the field logs . The automated samplers will be checked periodically and after <br /> each rainfall event to ensure proper function . <br /> Two equipment blanks will be taken during initial site set- up . Equipment blank <br /> results below the MDL will be the criteria for evaluation of field dec mtamination . <br /> Equipment tubing , autosampling , and other equipment will be visually inspected <br /> by field personnel to insure proper function and recorded in the fiel log . <br /> Acceptance criteria for data quality indicators will be stipulated as the precision <br /> and accuracy for the analytical measurements located in the Analytical QC <br /> Summary Report in the ELAB report for each project . <br /> 1136 . Instrument/Equipment Testing , Inspection & Maintenance <br /> The equipment will be checked periodically and after every rainfall Event to <br /> ensure proper function . Maintenance will be performed if necessary , These <br /> activities will be recorded in the field log . Laboratory equipment will be tested <br /> and maintained according to the requirements outlined in the Laboratory SOPs . <br /> B7 . Instrument Calibration and Frequency <br /> The equipment will be programmed and calibrated prior to installation at the <br /> Project site according to manufacturers guidelines ( ISCO ) and a record of the <br /> calibration will be kept with the equipment and recorded in the field log . <br /> Laboratory equipment will be calibrated according to the requirements outlined <br /> in the Laboratory SOPs , <br /> 138 . Inspection/Acceptance Requirements for Supplies <br /> The equipment (tubing , autosamplers , sample bottle , flow meter) wi I be visually <br /> inspected by Michael Wickwire to ensure proper function and recorc ed in the <br /> field log . <br /> 1139 . Data Acquisition Requirements for Non -direct Measurements <br /> No data from non -direct measurements is planned for this project . <br /> F :\Public Works\KeithM\Stormwater Projects\Gifford East\Water Quality Monitoring Program\Quality Assurance Project Plan\DEP <br /> QAPP East Gifford Revision 3- 16-2005 .doc <br />