My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-209
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 9:37:12 AM
Creation date
9/30/2015 8:51:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/14/2005
Control Number
2005-209
Agenda Item Number
11.I.1
Entity Name
Peninsula hydrologic Data Specialists, Inc.
Subject
East Gifford Stormwater Improvement Project
Work Order No.G-1 post construction stormwater monitoring
Archived Roll/Disk#
4001
Supplemental fields
SmeadsoftID
5011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Gifford QAPP <br /> Sectio C/D <br /> Revision No . <br /> Date : 3/ 16/05 <br /> Page 17 of 18 <br /> 1310 . Data Management <br /> Data ( pH , temperature , dissolve oxygen and salinity) collected in the field by Michael <br /> Wickwire will be recorded in a field log and then transferred into an Excel spreadsheet , <br /> Data received from U . S . Biosystems , Inc . will also be entered into the Excel <br /> spreadsheet in order to process , compile and analyze the data . Keith McCully will <br /> review the data entry . The Excel spreadsheet will be backed up each night onto a <br /> security system . <br /> Any tables or graphs generated for the data report package from the spreadsheet will <br /> accompanied by : <br /> 1 , raw data ( laboratory reports ) <br /> 2 , field logs <br /> 3 , automatic sampler information <br /> 4 , problems encountered <br /> C1 . Assessments and Response Actions <br /> The autosamplers will be periodically checked ( minimum of once every 7days ) and <br /> after every rainfall event to ensure proper function . Other than this no specific internal <br /> assessments or audits are planned for this project . Additionally , a copy of the latest <br /> approved Quality Assurance Project Plan (QAPP ) will be placed inside the protective <br /> enclosure of one of the automatic composite stormwater samplers to ensue that the <br /> QAPP is correctly followed . Section XXIII , Audit : Access to Records , is ref renced <br /> herein and shall be followed . <br /> C2 . Reports to Management <br /> Project specific QA Reports and final report will be submitted to Department of <br /> Environmental Protection , Division of Water Resource Management , Bureau of <br /> Watershed Management , Attn : Mr. Richard Hicks , 2600 Blair Stone Road , MS 3565 , <br /> Tallahassee , Florida 32399-2400 at a frequency of quarterly . <br /> RkPublic Works\KeithM\Stormwater Projects\Gifford East\Water Quality Monitoring Program\Quality Assurance Project Plan\DEP <br /> QAPP East Gifford Revision 3- 16-2005. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.