My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-209
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 9:37:12 AM
Creation date
9/30/2015 8:51:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/14/2005
Control Number
2005-209
Agenda Item Number
11.I.1
Entity Name
Peninsula hydrologic Data Specialists, Inc.
Subject
East Gifford Stormwater Improvement Project
Work Order No.G-1 post construction stormwater monitoring
Archived Roll/Disk#
4001
Supplemental fields
SmeadsoftID
5011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Gifford QAPP <br /> Sectio C/ D <br /> Revision No . <br /> Date : 3/ 16/05 <br /> Page 18 of 18 <br /> D1 . Data Review , Validation , & Verification <br /> Since the water quality- monitoring program will evaluate the pollution remc val <br /> effectiveness of the proposed stormwater detention pond , the data should be <br /> considered valid unless there is no observed decrease in the pollution loadings , <br /> Monitoring is an integral part of this project to determine the degree of pollution removal <br /> provided , in order to evaluate the effectiveness of this stormwater treatment technique . <br /> The stormwater data will compare lake influent water quality to lake effluent water <br /> quality . This information will be used to determine the pollutant removal effectiveness <br /> of the constructed stormwater system . Laboratory results will be validated according to <br /> NELAP , FDEP SOPs , and contract requirements . Jean Dent , Laboratory QC officer is <br /> responsible for data quality checks . <br /> Michael Wickwire , Project QC Officer, is responsible for the field data reviE w and <br /> validation according to FDEP SOP requirements . <br /> D2 . Validation & Verification Methods <br /> In the Final Report submitted to FDEP a statement will be made in Sectior 5 . 0 <br /> Conclusion/ Recommendations assessing the usability of the project data f r meeting <br /> the requirements of this project and that for whatever reason if the data should only be <br /> used in a limited fashion or not used at all this will be explained . <br /> F :\Public Works\KeithM\Stormwater Projects\Gifford East\Water Quality Monitoring Program\Quality Assurance Project Plan\DEP <br /> QAPP East Gifford Revision 3- 16-2005.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.