My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-209
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 9:37:12 AM
Creation date
9/30/2015 8:51:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/14/2005
Control Number
2005-209
Agenda Item Number
11.I.1
Entity Name
Peninsula hydrologic Data Specialists, Inc.
Subject
East Gifford Stormwater Improvement Project
Work Order No.G-1 post construction stormwater monitoring
Archived Roll/Disk#
4001
Supplemental fields
SmeadsoftID
5011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Three rainfalls totaling two inches or more each , will be sampled . <br /> Rain Gauge : <br /> A rain gauge located at the nearby Vero Beach Municipal Airport will be used for <br /> the pre-construction sampling phase . Rainfall readings will be recorded to the <br /> nearest 0 . 01 - inch , each day throughout the entire water quality monitoring <br /> program . <br /> Surface Water Testing Parameters : <br /> Field Measurements : <br /> 1 , Temperature <br /> 2 . pH <br /> 3 . Salinity <br /> 4 , Dissolved Oxygen <br /> Laboratory Analyses : <br /> 1 . Total Kjeldahl Nitrogen <br /> 2 , Nitrate- N , Nitrite- N <br /> 3 , Ammonia - N <br /> 4 , Total Phosphorus <br /> 5 , Color <br /> 6 , Biochemical Oxygen Demand ( BOD ) <br /> 7 . Total Suspended Solids (TSS ) <br /> 8 . Alkalinity <br /> Sample Locations and Other Pertinent Sampling Information : <br /> Sample locations are shown on the attached figure . All samples wi I be collected <br /> from a representative pool of stormwater ( mid depth ) in the wetland and will be <br /> collected in a large plastic container suitable for such sampling . The sampling <br /> container will be properly decontaminated before each sampling event , <br /> Proposed field instruments are : <br /> ( 1 ) YSI Environmental 4 YSI 63 pH /Salinity/Conductivity/Temperature <br /> Instrument , and <br /> (2 ) YSI Environmental YSI 55 Dissolved Oxygen Instrument . <br /> Post-Construction Monitoring : <br /> Post-construction samples will be composite samples taken by autom tic samplers <br /> equipped with peristaltic pumps and flow meters . Each automatic sampler will take <br /> flow-weighted composite samples ( i . e . the amount of sample collected is proportional to <br /> the flow rate ) . Post-construction monitoring will be as follows : <br /> Number of Sampling Locations : <br /> 2 <br /> F :\Public Works\KeithM\Stormwater Projects\Gifford East\Water Quality Monitoring Program\Quality Assurance 3roject Plan\Gifford <br /> Water Quality Sampling Plan .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.