My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/15/1967
CBCC
>
Meetings
>
1960's
>
1967
>
12/15/1967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2018 9:38:59 AM
Creation date
6/10/2015 1:43:49 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
12/15/1967
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. O'Neil and Mr. Davidson, referring to the problems relating <br />to Highway 60 and Highway I-95, reported that "construction plans <br />are nearing completion and right-of-way is being acquired for Inter- <br />state 95 through Indian River County and the section between State <br />Road 60 and the Brevard County Line will be under contract by May, <br />1968. We are receiving bids for the 7.9 -mile project in Brevard County <br />from the Indian River County linetto Grant at our December 22nd letting. <br />The Contract for the next project from ,Grant to•State Road 514 has been <br />let, therefore, the section between State Road 60 and State Road 511 will <br />all be under contract by May, 1968, and should be completed by the end of <br />1969. The 58 -mile section between State Road 511 and a connection with <br />U.S. 1 1.5 miles south of the Brevard-Volusia County Line is complete. <br />The next 29 miles from 1.5 miles south of the Brevard-Volusia County line <br />to the completed section at Interstate 4 west of Daytona Beach will all <br />be under contract by April, 1968, and should be completed by the end of <br />1969. This means that Interstate 95 from State Road 60 west of Vero <br />Beach to U.S. 17 near the Georgia State Line should be completerby the <br />end of 1969." <br />Mr. O'Neil was requested to make every effort to allocate funds so <br />that the reconstruction of Highway 60 from Highway I-95 into U.S. 1 <br />at Vero Beach Could be completed by the time Highway 1-95 connected <br />with Highway 60; otherwise the heavy traffic from Highway I-95 to Vero <br />Beach would be required to travel for a long period of time over torn -up <br />highway construction. Mx. O'Neil stated that everything possible would <br />• <br />be done to help the situation and possibly make construction from 20th <br />Avenue to the City Limits the first stage of the project. <br />It was also suggested that since there was work to be done on 27th <br />Avenue and 43rd Street, it would be advisable to have them completed <br />before Highway I-95 connects with. Highway 60, so that they could help <br />relieve the traffic influx. Mr. Davidson stated that if these roads <br />were to be used for this purpose, they should meet primary road rather <br />BOOK 10 PAU548 <br />than secondary road standards. <br />Further discussion arose regarding reconstruction of Highway 60 <br />from the I-95 Interchange west to the Yeehaw Junction int, ®rchange of <br />the Sunshine Parkway. Mr. Richards felt that its shoilbe7 rebuilt <br />
The URL can be used to link to this page
Your browser does not support the video tag.