My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/21/1968
CBCC
>
Meetings
>
1960's
>
1968
>
2/21/1968
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2018 9:06:28 AM
Creation date
6/10/2015 11:13:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/21/1968
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(m) Water connection to outlets for hose or <br />lawn faucets: <br />First connection <br />Each additional connection <br />$1.00 <br />.50 <br />FIRE CONTROL SYSTEM <br />Each hose cabinet 1.00 <br />FIRE SPRINKLER SYSTEM <br />Minimum permit fee for each installation <br />not to exceed $100. 00 <br />Each $500. 00 or fraction thereafter <br />4.00 <br />1.00 <br />SWIMMING POOL CONNECTIONS TO CITY WATER 5.00 <br />GAS (The following shall include bottle gas) <br />For the first outlet and/or appliance. ' . 3.00 <br />For each additional outlet and/or appliance 1.00 <br />For change from a master to an individual <br />meter 2.00 <br />For multiple meters at one location: <br />For first meter 2.00 <br />For each additional meter 1.00 <br />For major repairs to gas pipe where no <br />fixture or appliance installation is <br />involved <br />BOILERS <br />Minimum permit fee for installations not to <br />exceed $100. 00 <br />Each $500. 00 or fraction thereafter <br />FURNACES AND HEATING EQUIPMENT PER <br />UNIT INSTALLED • <br />For the first 200, 000 BTU per hour or frac- <br />tional part <br />For each additional 100, 000.. BTU. per hour <br />or fractional part <br />Note: The rating of furnace and heating <br />equipment shall be based on the BTU <br />input of fuel used per hour. <br />WELLS (Drilling or Digging) <br />Sprinkler Systems <br />2.00 <br />5.00 <br />2.00 <br />4.00 <br />WATER STORAGE TANKS (up to 1, 000 gallon's) 3. 00 <br />Each additional 1, 000 gallons or fraction <br />thereof 1.00 <br />WORK STARTED BEFORE A PERMIT IS ISSUED THE <br />FEE SHALL BE DOUBLED. <br />MECHANICAL PERMIT FEES <br />When application for permit is approved and before <br />a permit is issued, a fee therefor shall be paid based <br />on the following schedule of rates: <br />34 <br />FEB .2 1 196a <br />eoot 11 PAG€1"t° <br />
The URL can be used to link to this page
Your browser does not support the video tag.