Laserfiche WebLink
TASK 2.0 -SEMI-ANNUAL WATER QUALITY SAMPLING AND REPORTING <br />CDM Smith will assist IRC SWDD with all sampling preparation activities including scheduling, <br />staffing, subcontracting, and field equipment preparation. CDM Smith will perform the field testing, <br />sample collection, and water -level measurements. CDM Smith will contract with Ideal Tech Services <br />Inc. (ITS) to perform the groundwater and surface water sampling. CDM Smith/ITS will perform the <br />sem'-annual (January and July) sampling of the Class I and construction and demolition (C&D) <br />debris landfill groundwater monitor wells (41 in January and 25 in July) for the list of Semi -Annual <br />Ground Water Parameters identified in Paragraph 8 of the MPIS, included in Permit Nos. SC31- <br />0128769-019 and S031-0128769-020 as modified by the Second Request for Additional <br />Information, Permit Renewal Application S031-0128769-021 dated July 5, 2012 and the response <br />by CDM Smith on behalf of IRC dated July 16, 2012. CDM Smith/ITS will collect water level data for <br />the groundwater monitor wells and staff gauges prior to the sampling event. <br />CDM Smith/ITS will also perform semi-annual (January and July) sampling of the six surface water <br />sites for analysis of the list of Semi -Annual Surface Water Parameters identified in Paragraph 14 of <br />the MPIS included in Permit Nos. SC31-0128769-019 and S031-0128769-020 as modified by the <br />Second Request for Additional Information, Permit Renewal Application S031-0128769-021 dated <br />July 5, 2012 and the response by CDM Smith on behalf of IRC dated July 16, 2012. It is estimated <br />that data collection and sampling will take five days to complete per sampling event. In the event <br />that FDEP requires resampling of groundwater monitoring wells the labor and materials will be <br />invoiced under Task 4 of this Scope of Services. If the resampling is the result from errors made by <br />the sampling staff, IRC will not be invoiced. CDM Smith/ITS will deliver the samples to the ENCO <br />O rlando office for analysis. <br />U nless otherwise determined by IRC SWDD, ENCO will perform the laboratory analysis under IRC <br />SWDD's contract. CDM Smith will assist IRC SWDD in coordinating the analytical testing activities <br />with ENCO, notify FDEP prior to sampling as required by the MPIS, review and evaluate the <br />analytical test results, and prepare the semi-annual reports. <br />CDM Smith will prepare two semi-annual reports that will be submitted to FDEP within 60 days of <br />receipt of valid laboratory results from the laboratory that is contracted by IRC SWDD to analyze <br />samples. Services included in preparing the semi-annual reports entail: <br />■ Review of laboratory results with respect to FDEP groundwater quality criteria and historical <br />laboratory results. If review of the data indicates potential errors in the results or concentrations <br />of analyses that could potentially result in enforcement action, CDM Smith will notify IRC SWDD <br />prior to preparing the report and request confirmatory samples, if needed. <br />■ Preparation of semi-annual monitoring reports for the January and July monitoring events. The <br />reports will include brief discussions of the results, water level contour maps, and copies of the <br />analytical reports. A draft report will be submitted for review, if requested. <br />■ CDM Smith will prepare three copies of the final report for submittal to FDEP and will provide <br />one file copy to IRC SWDD. <br />IRC SWDD will provide copies of analytical reports in electronic format (AdApt, or other electronic <br />format accepted by FDEP). <br />A-3 <br />Jj1375,docx <br />