Laserfiche WebLink
TASK 3.0 - TITLE V PERMIT COMPLIANCE AND REPORTING <br />Title V Permit No. 0610015 -004 -AV, which is the current permit as of the date of this work order, <br />contains monitoring and reporting requirements related to the landfill gas collection and control <br />system. CDM Smith will assist IRC SWDD, as described below, in fulfilling all air permit <br />requirements and conditions within the required regulatory timeframes. <br />Statement of Compliance <br />CDM Smith will prepare and submit the annual Statement of Compliance for the IRC Landfill. This <br />document must be submitted to FDEP within 60 days after the end of the calendar year, as required <br />by Rule 62-213.440(3)(a)(2), F.A.C. <br />Annual Operating Report <br />CDM Smith will prepare and submit the Annual Operating Report for the IRC Landfill. This report <br />must be submitted to FDEP on or before April 1 of each calendar year, as required by Rule 62- <br />210.370(3), F.A.C. <br />CDM Smith will estimate the annual emission rates of non -methane organic compounds and volatile <br />organic compounds from the landfill gas to determine the IRC Landfill's status with regard to <br />operation and reporting requirements of the active landfill gas collection and control system under <br />the New Source Performance Standards requirements. <br />Annual Emissions Fee <br />The Electronic Annual Operating Report (EAOR) application used for reporting to FDEP will <br />automatically calculate the annual emission fee for the facility. CDM Smith will notify IRC SWDD of <br />the fee amount. Once the check is in -hand, CDM Smith will submit the fee on IRC SWDD's behalf <br />prior to the April 1 deadline. <br />Visible Emissions Testing <br />CDM Smith will contract with a certified observer to perform the annual visible emissions test in <br />order to determine the opacity of the flare. CDM Smith will provide oversight of the annual visible <br />emission testing of the flare, notify FDEP of the time and location of the test, and prepare and <br />submit to FDEP a report of the test results. <br />TASK 4.0 - GENERAL TECHNICAL AND MISCELLANEOUS PERMIT COMPLIANCE ASSISTANCE <br />CDM Smith will provide general technical and permit compliance assistance to IRC SWDD staff on <br />an as needed basis. IRC SWDD staff is performing a number of the tasks required annually by the <br />current FDEP landfill permits. CDM Smith will provide support as needed for the SWDD staff as they <br />perform these tasks. <br />General technical and permit compliance assistance tasks may include: <br />■ Reporting required by the Multi -Sector Generic Permit for stormwater discharge• <br />■ Quarterly monitoring and reporting of the landfill gas monitoring wells located at the IRC <br />Landfill site boundary, as well as enclosed structures located on site; <br />■ Preparing agenda items for and attending IRC Board of County Commissioners meetings, <br />■ Developing annual IRC SWDD budgets, and <br />■ Miscellaneous permit renewals or technical support <br />■ Sampling and reporting for additional monitor wells, surface water, leachate, etc. <br />A-4 <br />J11375.docx <br />