My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-088
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 12:09:33 PM
Creation date
10/1/2015 6:09:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/01/2014
Control Number
2014-088
Agenda Item Number
8.E.
Entity Name
CDM Smith
Subject
Work Order No. 12 Well No. 7
Area
South County RO plant
Supplemental fields
SmeadsoftID
13411
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is still required to give staff the opportunity to review and approve the final location, elevation and <br />design of the proposed well prior to commencing construction. During the 2009 design process, a well <br />location was selected within the South County Park that fell within the designated stormwater detention <br />area for the park. Consultant coordinated with the local drainage district and SJRWMD staff via phone to <br />select the location. Since the well is proposed to be constructed into the UFA, SJRWMD indicated that <br />the proximity to the stormwater area would not be problematic so long as the finished elevation of the <br />wellhead was above that of the permitted stormwater elevation. The field verification by SJRWMD staff, <br />however, was not conducted before the project was placed on hold. Consultant will coordinate, prepare <br />for and participate in the field verification meeting with SJRWMD. <br />TASK 3.0 PREPARATION OF FINAL BID PACKAGE <br />The County's original intent was to bid the well construction, pump assembly and <br />wellhead/appurtenances as one bid package, with all below -ground transmission piping connecting Well <br />No. 7 to the Well No. 6 raw water main to be bid in a separate package. It is now the County's intention <br />to bid the entire project as a single package. Consultant will combine the bid packages to eliminate <br />redundancy and prepare a single'set of plans and specifications suitable for obtaining bids. Consultant <br />will update the design documents, as needed, to reflect current building code and modify the <br />recommended suppliers if necessary. Consultant will also prepare County front-end documents to <br />accompany the bid package. Consultant anticipates receipt of a current version of generic front end <br />documents from County staff, previously approved by the County attorney, to customize for this bid <br />package. <br />Subtask 3 1 Final Contract Documents <br />Consultant will update the design documents to merge the previous documents into 1 bid package, to <br />reflect current building code current vendor information, re-route the transmission piping around the <br />new lift station and piping and reconfigure the connection point to the Well No. 6 transmission main so <br />as to minimize impacts to the newly constructed lacrosse fields. <br />Subtask 3 2 Final Contract Document Submittal <br />Consultant will submit three hardcopy sets of final contract documents to County staff prior to <br />advertisement of the bid for the Project. Consultant will also provide digital files of plans and technical <br />specifications in PDF format to the County for use in publishing the bid on DemandStar. The County will <br />advertise for bids and provide necessary documentation to potential bidders. Consultant will not <br />provide additional hardcopies of bid documents to prospective bidders unless negotiated for <br />reimbursement from the County prior to doing so. <br />Subtask 3.3 Preparation of Probable Construction Cost <br />Consultant will prepare an opinion of the probable construction cost based on the final bid package <br />prior to advertising the bid. The final estimate of probable construction cost shall be delivered to County <br />staff prior to the opening of bids for the Project. <br />TASK 4.0 WELL CONSTRUCTION PERMITTING <br />Consultant has confirmed with SJRWMD that no additional permitting is required from this agency in <br />order to construct Well No. 7 (plans and specifications will still require review as outlined in Task 1). <br />In order to construct the new Well No. 7, the County must file for a construction permit with the Florida <br />Department of Environmental Protection (FDEP). Consultant will prepare and submit the "Specific <br />Permit to Construct Potable Water System Components' (FDEP Form 62-555.900(1)) prior to bidding the <br />A-2 <br />111490.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.