Laserfiche WebLink
e . The GRANTEE shall submit the lab and field data above electronically in either Excel or Access format. <br /> 5 . AUDITS <br /> a. AUDITS BY THE DEPARTMENT — Pursuant to Rule 62- 160 . 650, F.A.C . , the Department may conduct audits <br /> of field and/or laboratory activities. In addition to allowing Department representatives to conduct onsite <br /> audits, the GRANTEE, upon request by the Department, must provide all field and laboratory records <br /> pertinent to the contracted field and laboratory activities. If an audit by the Department results <br /> in a <br /> determination that the reported data are not usable for the purpose(s) or do not meet the data <br /> quality <br /> objectives specified by the Contract, the DEP contract manager shall pursue remedies available to the <br /> Department, including those outlined in Section 8 below. <br /> b. PLANNING REVIEW AUDITS - <br /> (i) Initial : Within 15 days of completing the first sampling and analysis event, the GRANTEE and all <br /> associated subcontractors shall review the planning document (see Section 6 below) relative to the <br /> completed field and laboratory activities to determine if the data quality objectives are being met, <br /> identify any improvements to be made to the process, and refine the sampling and/or analytical design <br /> or schedule. Within one month of the review, a summary of the review, including any corrective <br /> action plans or amendments to the planning document, shall be sent to the DEP Grant Manager and a <br /> copy shall be maintained with the permanent project records. <br /> (ii) Ongoing: Planning reviews as described in item (i) above shall occur annually. <br /> c . QUALITY SYSTEMS AUDITS — The GRANTEE and all subcontractors shall ensure that any required <br /> laboratory and field quality system and management systems audits are performed according to the <br /> respective Quality Manuals for each contracted and sub-contracted entity. These audits shall be <br /> documented in the GRANTEE ' s and subcontractors ' records. <br /> d. STATEMENTS OF USABILITY — As a part of the audit process and the final report, the GRANTEE shall <br /> provide statements about data usability relative to the Contract Data Quality Objectives and Data Quality <br /> Indicators specified in the planning document, this attachment and the addenda. <br /> (i) The GRANTEE shall ensure that all acceptance and usability criteria required by this Agreement not <br /> specified above are listed in the planning document. <br /> (ii) The GRANTEE shall ensure that the results of all quality control measures described above <br /> are <br /> evaluated according to the acceptance criteria listed in this attachment, the addenda and the planning <br /> document. <br /> (iii) The GRANTEE shall ensure that all sample results are evaluated according to the additional usability <br /> criteria specified in the planning document. <br /> 6. PLANNING DOCUMENT <br /> a. . The GRANTEE shall submit the planning document identified below to the DEP Grant Manager no later <br /> than 120 days prior to the commencement of field and laboratory activities. Failure to submit the planning <br /> document in this required timeframe shall result in a delay of approval to begin work until the document <br /> has been submitted to the Department and approved by the DEP Grant Manager. The document shall be <br /> submitted as a Quality Assurance Project Plan (QAPP) that is prepared in accordance with <br /> "EPA <br /> Requirements for Quality Assurance Project Plans, EPA QA/R-5", (EPA/240B .01 /003 March 2001 ). <br /> b. The GRANTEE and subcontractors may submit a version of the planning document to the Department for <br /> approval no more than three times . If the GRANTEE fails to obtain approval for the planning document <br /> after the third (final) submission to the Department, the DEP Grant Manager may suspend or terminate the <br /> Agreement. <br /> c. The DEP Agreement number shall appear on the title page of the submitted planning document. Within <br /> forty-five (45 ) days of receipt of the properly identified planning document by the Department, <br /> the <br /> Department shall review and either approve the planning document or provide comments to the GRANTEE <br /> and affected subcontractors as to why the planning document is not approved. If further revisions are <br /> needed, the GRANTEE shall then have fifteen ( 15) days from the receipt of review comments to respond. <br /> The Department shall respond to all revisions to the planning document within thirty (30) days of receipt of <br /> any revisions . <br /> d. If the review of the planning document by the Department is delayed, through no fault of the GRANTEE, <br /> beyond sixty (60) days after the planning document is received by the Department, the GRANTEE shall <br /> have the option, after the planning document is approved, of requesting and receiving an extension in the <br /> term of the Agreement for a time period not to exceed the period of delayed review and approval . This <br /> option must be exercised at least sixty (60) days prior to the current termination date of the Agreement. <br /> Revision Date: 02/09 <br /> DEP Agreement No. G0353, Attachment J. Page 4 of 14 <br />