Laserfiche WebLink
The CONTRACTOR and its SUB CONTRACTORS must utilize the United States Department <br /> of Homeland Security' s &Verify system to verify the employment eligibility of all new <br /> employees. This applies to your SUB CONTRATORS as well . <br /> The Project Consultants were introduced as follows : <br /> Arcadis US . , Inc . — Hank Deibel <br /> Kimley-Horn & Associates . , Inc . — Brian Good <br /> Bridge Design Associates, Inc. - Brian Rheault <br /> Lucido & Associates — Sub Consultant to Arcadis <br /> Masuen Consulting, LLC- Sub Consultant to Arcadis <br /> Indian River County Engineering Division <br /> PROJECT DESCRIPTION: <br /> The proposed improvements . to 66th Avenue consist of the widening and reconstruction of the <br /> roadway to a 44ane divided roadway section from SR 60 to north of 49d' Street. Curb and gutter <br /> and a raised median will be provided. An eight-foot wide concrete sidewalk will be provided on <br /> the west side of the roadway. <br /> The existing bridges at all intersecting side streets will be removed and replaced . <br /> The side streets on the east and west of the intersection approaches will be widened and <br /> reconstructed to a three lane roadway section. <br /> The three lane section on the side streets will consist of: <br /> • One 12400t wide travel lane in each direction <br /> • A 12- foot wide left tum lane <br /> • Two 4 ' paved shoulders with a sidewalk along the north side <br /> • Five foot (5 ) utility shelf on both sides <br /> The side streets will transition to match the existing two lane roadway section east and west of <br /> the intersections . <br /> A closed storm water drainage system will be constructed within the project limits . The storm <br /> water drainage system will consist of inlets and a subsurface pipe system to collect and convey <br /> storm water runoff from the roadway. From North of SR 60 to 26th Street, storm water drainage <br /> will be conveyed to the Vista Plantation development for water quality treatment and attenuation. <br /> From 26th Street to 33rd Street, storm water runoff will be conveyed to the Trillium development <br /> for water quality treatment and attenuation . North of 33rd Street five (5) storm water detention <br /> ponds will be constructed along the west side of the roadway to provide for water quality <br /> treatment and attenuation in accordance with the requirements of the Indian River Farms Water <br /> Control District (IRFWCD) and the St. Johns River Water Management District (SJRWMD). <br /> New traffic signals will be installed at the following intersections : <br /> • SR 60 and 66th Avenue <br /> • 26th Street and 66th Avenue <br /> • 41st Street and 66th Avenue <br /> • 45th Street and 66d' Avenue <br /> F:'Tublic WorkALNGI\LL UNG DIVISION PR0! LCTS\0545-6611 Ave SR60 to 57th St (.Aratdis) Admfin%J3id L)vcwnetits`.Yre-BidtYre-tiid <br /> meetine minute: I1 -7- 12.doc <br /> F <br />