My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C.1
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:05:06 PM
Creation date
10/1/2015 5:05:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/18/2012
Control Number
2012-227C.1
Agenda Item Number
12.I.2
Entity Name
Dickerson, Florida Inc.
Subject
Addendum No.1
66th Avenue Roadway Improvments
Area
SR 60 to North of 49th Street
Bid Number
2013008
Supplemental fields
SmeadsoftID
11698
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The CONTRACTOR and its SUB CONTRACTORS must utilize the United States Department <br /> of Homeland Security' s &Verify system to verify the employment eligibility of all new <br /> employees. This applies to your SUB CONTRATORS as well . <br /> The Project Consultants were introduced as follows : <br /> Arcadis US . , Inc . — Hank Deibel <br /> Kimley-Horn & Associates . , Inc . — Brian Good <br /> Bridge Design Associates, Inc. - Brian Rheault <br /> Lucido & Associates — Sub Consultant to Arcadis <br /> Masuen Consulting, LLC- Sub Consultant to Arcadis <br /> Indian River County Engineering Division <br /> PROJECT DESCRIPTION: <br /> The proposed improvements . to 66th Avenue consist of the widening and reconstruction of the <br /> roadway to a 44ane divided roadway section from SR 60 to north of 49d' Street. Curb and gutter <br /> and a raised median will be provided. An eight-foot wide concrete sidewalk will be provided on <br /> the west side of the roadway. <br /> The existing bridges at all intersecting side streets will be removed and replaced . <br /> The side streets on the east and west of the intersection approaches will be widened and <br /> reconstructed to a three lane roadway section. <br /> The three lane section on the side streets will consist of: <br /> • One 12400t wide travel lane in each direction <br /> • A 12- foot wide left tum lane <br /> • Two 4 ' paved shoulders with a sidewalk along the north side <br /> • Five foot (5 ) utility shelf on both sides <br /> The side streets will transition to match the existing two lane roadway section east and west of <br /> the intersections . <br /> A closed storm water drainage system will be constructed within the project limits . The storm <br /> water drainage system will consist of inlets and a subsurface pipe system to collect and convey <br /> storm water runoff from the roadway. From North of SR 60 to 26th Street, storm water drainage <br /> will be conveyed to the Vista Plantation development for water quality treatment and attenuation. <br /> From 26th Street to 33rd Street, storm water runoff will be conveyed to the Trillium development <br /> for water quality treatment and attenuation . North of 33rd Street five (5) storm water detention <br /> ponds will be constructed along the west side of the roadway to provide for water quality <br /> treatment and attenuation in accordance with the requirements of the Indian River Farms Water <br /> Control District (IRFWCD) and the St. Johns River Water Management District (SJRWMD). <br /> New traffic signals will be installed at the following intersections : <br /> • SR 60 and 66th Avenue <br /> • 26th Street and 66th Avenue <br /> • 41st Street and 66th Avenue <br /> • 45th Street and 66d' Avenue <br /> F:'Tublic WorkALNGI\LL UNG DIVISION PR0! LCTS\0545-6611 Ave SR60 to 57th St (.Aratdis) Admfin%J3id L)vcwnetits`.Yre-BidtYre-tiid <br /> meetine minute: I1 -7- 12.doc <br /> F <br />
The URL can be used to link to this page
Your browser does not support the video tag.