Laserfiche WebLink
New bridges will be constructed at the following intersections . <br /> • 33rd Street and 66th Avenue <br /> • 37th Street and 66th Avenue <br /> 41 st Street and 66th Avenue <br /> • 45d' Street and 66th Avenue <br /> 49th Street and 66th Avenue <br /> The project will be administered by Indian River County (IRC). <br /> CORRESPONDENCE/LINES OFAUTHORIm <br /> All project correspondence should be addressed to Jerry Davis, Purchasing Manager, Indian <br /> River County, Engineering Division, 1800 27d' Street, Vero Beach, Florida 32960 during the bid <br /> process — purchasing@a ,irc og v. com <br /> Construction Phase will be turned over to D . Howard, Construction Coordination Manager with <br /> an Engineering Inspector assigned . <br /> The bridge inspection will be performed by Indian River County, Bridge Design & Associates <br /> and Kimley-Horn & Associates staff. <br /> PROJECT DISCUSSION: <br /> • SCHEDULE: <br /> The winning contractor is to submit a construction schedule for the sequence of <br /> construction as soon as possible, preferably within 5 -days .after the award of bid . <br /> • TIME OF COMPLETION <br /> The time for completion is very essential on the subject project. A portion of the project is <br /> funded by the State, hence the reimbursable funding is time sensitive. Strict adherence to the <br /> schedule will be required and monitored. Several questions were raised with regards to time <br /> of completion. The questions were mainly in regards to if the County would entertain work <br /> beyond the normal hours operation (7 : 00 AM to 5 : 00 PM) and if so %what is the responsibility <br /> of the Contractor. <br /> The County will entertain work beyond the regular hours. If the subject work does not <br /> require inspection or materials testing, the Contractor may work after hours with prior notice <br /> to the Construction Coordination Manager. If the work requires inspection and testing, then <br /> Contractor will be responsible to coordinate this work with the Construction Coordination <br /> Manager and also reimburse the County for inspector' s time and any overtime incurred by <br /> the materials testing technician . The County inspectors are paid an average $ 33 .38 per hour <br /> regular time. This rate will be multiplied by 1 . 5 for any overtime. The County Inspectors <br /> will work their regular schedule which is Monday through Friday except Indian River County <br /> observed holidays. <br /> • FIELD OFFICE <br /> The Field Office must be established within the project limits. There might be a potential <br /> site on the west side of 66th Avenue between 37th Street and 41St Street. The Contractor will <br /> need to negotiate the details with the property owner. <br /> I;A'ublic Works\LNGINEER] ING DIVISION PROJLCTSt0545-66Th Ave SR60 to 57th St (Arcadisl'•AdmimU3id DocuinentstPre-Bid�.Pre-bid <br /> meelins minutes I I 4 - 12.d00% <br />