Laserfiche WebLink
C 1. Geotechnical Investigation <br />The ENGINEER had previously completed and submitted the Soils Conditions Survey for the <br />project. The supplemental work that is required to address this agreement is related to <br />modified/relocated pond sites. The related pond in question is Pond 7, located on the Graves <br />Brothers property, north of CR-510/SR-510 intersection, and west of SR-5/LTS-1, in the <br />approximate northeast quadrant of the existing. Graves Brother property. Additional geotechnical <br />investigations will be required in this area, to assist the drainage engineer with design parameters <br />for the modified/relocated Pond 7. <br />This effort/fee will be listed under the Lump Sum Components of Geotechnical Investigation, in "Section <br />V —Compensation." <br />D. Roadway Desi Tans <br />15. The ENGINEER shall modify the plans, as requested by the COUNTY,, in meeting January 3, <br />2013, to include the topographic and drainage features, as stipulated in B. Design Surveys, of <br />this herein Supplemental Agreement, and including DTM data, as well as incorporating the <br />Florida Department of Transportation (FDOT) SR -510 Construction Plans, Financial Project <br />ID# 427022-1-523-01 [begin project, immediately west of SR-5/IJS-1, and extending <br />approximately 2,743 feet east, to the vicinity of the Intracoastal Waterway Bridge (#880052)]. <br />The following information, enumerates this detail: <br />a. Additional Survey/Desien Plans Incorporation <br />The ENGINEER shall incorporate in the plans any updates, as noted above, and in <br />particular, the revisions to the areas of the revised plan limits, and the incorporation <br />of the FDOT SR -510 Construction Plans, with Financial Project ID# 427022=1-523- <br />01. <br />b. Construction Plan Revisions <br />As part of the construction plan revisions, due to the revised limit of the project, at <br />its western termini, in the vicinity of 55`s Avenue, the following plan sheets/elements <br />will require revisions: <br />• Title Sheet <br />• Typical Section Sheets <br />o Revise for station limits <br />o Add atwo-lane transition for NEW beginning of project <br />• Summary of Quantity Sheets <br />• Summary of Drainage Structure Sheets <br />_ _ __ <br />