My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-063
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:13:39 PM
Creation date
10/1/2015 5:13:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
03/19/2013
Control Number
2013-063
Agenda Item Number
8.O.
Entity Name
McMahon Associates Inc. Agreement
Subject
Intersection Improvements
Area
CR 510 and Highway 1
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
11829
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• General IN Sheets <br />• Plan/Profile Sheets <br />• Miscellaneous Details/Roadway Cross -Sections <br />• Modified/Relocated Pond 7 Sheets, including conveyance <br />• Drainage Structure Cross -Section Sheets <br />• Storm Water Pollution Prevention Plans <br />• Traffic Control Plans <br />• Utility Verification Sheets <br />• Component Plans <br />o Signing and Marking Plans <br />o Signalization Plans <br />o Landscape Plans <br />o Utility Improvement Plans <br />16. The ENGINEER shall modify the plans, as requested by the COUNTY, to provide a 4 -lane <br />roadway to 2 -lane roadway transition, at the NEW revised western project termini, in the <br />vicinity of the 55th Avenue intersection. <br />17. The ENGINEER shall modify the plans, as requested by the COUNTY, to address <br />supplemental storm water design. The revisions required are to address the storm water <br />drainage design and plan/profile revisions to develop a NEW western termini, in the vicinity <br />of 55th Avenue. <br />The effort/fee for these tasks will be contained in the Lump Sum Components of the Roadway Design, in <br />"Section V —Compensation." <br />Additional effort is also required by the ENGINEER to re -do the plans, profiles, and cross-sections, and <br />project related retention ponds. Any work associated with the retention ponds, are enumerated below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.