Laserfiche WebLink
• General IN Sheets <br />• Plan/Profile Sheets <br />• Miscellaneous Details/Roadway Cross -Sections <br />• Modified/Relocated Pond 7 Sheets, including conveyance <br />• Drainage Structure Cross -Section Sheets <br />• Storm Water Pollution Prevention Plans <br />• Traffic Control Plans <br />• Utility Verification Sheets <br />• Component Plans <br />o Signing and Marking Plans <br />o Signalization Plans <br />o Landscape Plans <br />o Utility Improvement Plans <br />16. The ENGINEER shall modify the plans, as requested by the COUNTY, to provide a 4 -lane <br />roadway to 2 -lane roadway transition, at the NEW revised western project termini, in the <br />vicinity of the 55th Avenue intersection. <br />17. The ENGINEER shall modify the plans, as requested by the COUNTY, to address <br />supplemental storm water design. The revisions required are to address the storm water <br />drainage design and plan/profile revisions to develop a NEW western termini, in the vicinity <br />of 55th Avenue. <br />The effort/fee for these tasks will be contained in the Lump Sum Components of the Roadway Design, in <br />"Section V —Compensation." <br />Additional effort is also required by the ENGINEER to re -do the plans, profiles, and cross-sections, and <br />project related retention ponds. Any work associated with the retention ponds, are enumerated below. <br />