M. Retention Pond Desiean and Overall Project Storm Water Management Report <br />This herein supplemental agreement will address two (2) sites, Pond 2, and Pond 7. The revisions <br />to the overall project Storm Water Management report will also be incorporated with this work. <br />1. Pond 2, will basically remain the same, and will reflect the design to incorporate the ultimate <br />needs of CR -510. The revisions will consider storm water piping and inlets in the general <br />azea, and in consideration of the 4 -lane to 2 -lane roadway transition. The ENGINEER will <br />evaluate retaining, as best as possible, the location of inlets and manholes, .and also address <br />overland flows from private property and driveway access, as these features may have an <br />impact on drainage facilities. <br />2. Pond 7, is located on the Graves Brothers property. The current location, as previously <br />designed, needs to be relocated, in a fashion, which meets, as best as possible, the location, as <br />preferred by the land owner, and his engineer. The ENGINEER has been provided a Concept <br />Plan, from Schulke, Bittle & Stoddazd, LLC, entitled Conceptual Plan for Graves Brothers <br />Wabasso Crossing, not dated. This plan depicts a storm water retention pond in the northeast <br />quadrant of the property. The ENGINEER will re-evaluate the drainage patterns, and the <br />roadway design, and develop a modified design for Pond 7, to best meets the needs of the <br />COUNTY, and consistent with the CR -510 design/plans. The overall intent is to still <br />maintain its proposed outfall. <br />3. The overall project storm water management report will be updated to reflect: 1) the NEW <br />western termini of CR -510, and 2) any modifications to the storm water management plans <br />for the project, and including the proposed number of storm water retention ponds. The <br />ENGINEER will use this overall report to coordinate with the governing agencies for Storm <br />Water Management Control, and as required the FDOT, for -their respective portions of <br />interest to this project. <br />This effort/fee will be contained under the Lump Sum Components of Roadway Design, in "Section V - <br />Compensation." <br />N. Maintenance of Traffic (MOTZ,PIans <br />MOT plans aze required for the revised project conditions. The existing MOT plans will be <br />revised to reflect the NEW western termini and the proposed patterns of traffic control, which will <br />be required to address the 4 -lane to 2 -lane transition, and its impacts, immediately at the <br />intersection of 55`'' Avenue. <br />