Laserfiche WebLink
Work Order No. 1-Solid Waste Master Plan Update <br /> Task Deliverable: <br /> • Draft and Final Project Control Plan- electronic submittal <br /> • Meeting agenda and summary- electronic submittal <br /> Task 2= Background Data Collection & Review <br /> The Consultant will prepare a list of information and data needed and submit the list to the <br /> County. The Consultant will collect from SWDD the requested information including the <br /> existing available information related to landfill operations, CCC facilities, and historical waste <br /> flow by categories, historical CIP expenditures, approved fiscal year budget summaries, and <br /> other pertinent documents. The information will also include updated topographic and aerial <br /> surveys, current disposal area and remaining permitted disposal capacities, personnel and <br /> administration costs, landfill operations contracted costs, other private and public SWDD <br /> contracts, closure financial reports, landfill site plan revisions since the 2006 Master Plan, and <br /> status of existing permits and renewal schedules . The Consultant will coordinate with other <br /> consultants to receive updated site and development plans for County' s solid waste facilities . <br /> The Consultant will visit the landfill and the CCC facilities for observation of the current <br /> conditions and review the plans for improvements . The Consultant will discuss the operations <br /> with the County and staff at of the CCC, landfill, recycling and household hazardous waste <br /> collection center, and other facilities . <br /> The Consultant will collect from the County updated data and engineering plans and <br /> construction cost estimates prepared by other Consultants related to new properties purchased, <br /> landfill facility site development, CCC expansion/ improvement plans and other on-going CIP <br /> engineering design plans . If warranted and as requested by the County, the Consultant will <br /> schedule a meeting/ phone conference with other Consultants to collect other available updated <br /> information related to solid waste recycling and processing, landfill permitting plans and collect <br /> other available information in order to eliminate duplication of work. Conceptual or planning <br /> level design of improvements or expansions to the landfill or the CCC facilities is not included <br /> in this task. These are assumed to be available from the County . <br /> Task Deliverable: <br /> • The draft Section 1 will be submitted as a Technical Memorandum (TM) for SWDD <br /> review and comment prior to integration into the 2014 Management Plan Report. <br /> Task 3= Solid Waste Projections and Current Cost-of-Service Analysis <br /> The Consultant will utilize the current data from the annual closure cost financial responsibility <br /> reports, recent historical solid waste flow to the landfill (contracted tonnage summaries), waste <br /> compaction rates and capacity utilization, current population estimates and trends to prepare <br /> an update of the solid waste flow projections for the duration of the useful life of the existing <br /> landfill. This will include projections and breakdown of the projected solid waste flow <br /> quantities requiring processing and disposal . Based on this projection and current regulatory <br /> requirements, the Consultant will identify the disposal and operations processing needs of the <br /> System for the duration of the 25-year planning period . The current agreements in place for <br /> yard waste disposal, solid waste collection and transfer operations at the CCC facilities, on-site <br /> C&D processing and landfilling with the current Class I solid waste, and the potential private <br /> C&D facilities in the vicinity of the landfill will be considered . <br /> [3] <br />