My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-094A
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-094A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 10:38:12 AM
Creation date
10/1/2015 2:10:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/13/2010
Control Number
2010-094A
Agenda Item Number
8.C.1.
Entity Name
Ranger Construction
Subject
Sector 3 Beach & Dune Restoration Project
Change Order 1
Supplemental fields
SmeadsoftID
9644
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sector 3 Beach & Dene Restoration Project Attachment I to Change Order No . I <br /> construction . If the CONTRACTOR fails to remove the rock, rubble or debris , to <br /> the satisfaction of the ENGINEER, such debris may be removed by the COUNTY <br /> and the cost of such removal may be deducted from any money due , or to become <br /> due , to the CONTRACTOR or may be recovered under his bond <br /> Item 7 : Technical Specifications — Section 6 . 4 . 1 Beach Conditions <br /> Section 6 . 4 . 1 is amended as follows : <br /> 6 . 4 . 1 Beach Conditions : The beach is subject to changes and the elevations on the <br /> beach at the time the work is done may vary from the elevations shown on the <br /> Drawings . This fact should be taken into consideration by the <br /> bidde CONTRACTOR . The CONTRACTOR is to place the fill on the beach in <br /> such a manner as to establish a uniform beach between adjacent pay profile lines . <br /> Segments of beach located between pay profiles will not be underfilled , as <br /> defined in the "Pay Profiles" Section of these Specifications . The ENGINEER <br /> reserves the right to vary the width or grade of the berm from the lines and grades <br /> shown on the Drawings or observed at the Project site in order to establish a. <br /> uniform beach between adjacent pay profile lines or for the entire length of the <br /> Project . The fill templates shown on the Drawings are for the purpose of <br /> ESTIMATING the amount of fill needed and will be used by the ENGINEER in <br /> making any change in the lines and grades . The CONTRACTOR will not be <br /> required to dress the fill below mean high water to the slope shown but will be <br /> required to dress the beach as specified in the "Dressing" Section of these <br /> Specifications . <br /> Item 8 : Technical Specifications — Section 7 . 1 Payment for Mobilization and Demobilization. <br /> Section 7 . 1 is amended as follows : <br /> 7. 1 All costs connected with the mobilization and demobilization of all the <br /> CONTRACTOR' s plant and equipment will be paid for at the contract lump sum <br /> price for this item . 12ive per-een ( Go/ ) of the 1 „ mp stim price 69r this bid isom will <br /> be pnl� -� r COUNTY ic. suanee of .� <br /> rn, sa-ccncc-vrtl�--�ai41-c`tl-N-9t}E@t0Jpro Ee@ d . in-iic ii-t3-6imi <br /> Fifteen percent ( 158%) of the lump sum price will be paid after COUNTY <br /> issuance of the Notice to Proceed . An additional forty- five percent (45 %) of the <br /> lump sum price will be eligible for pa. ny lent paid to the CONTRACTOR after <br /> successful mobilization of plant, equipment and personnel pursuant to all <br /> appropriate specifications AND placement of a quantity of, at minimum, four <br /> thousand (4 , 000) cubic yards of material on the beach and within the construction <br /> template in a twenty-four (24) hour period (or less time) <br /> Item 9 : Technical Specifications — Section 8 . 1 Payment <br /> Section 8 . 1 is amended as follows : <br /> 8 . 1 Payment. Other than costs for mobilization, demobilization and beach tilling , all <br /> costs connected with debris removal , excavating , transporting, and constructing <br /> the beach fill shall be included in the contract unit price per cubic yard for Sand <br /> Fill on the Bid fm, whish payment shall also include all other items of <br /> overhead, profit, Jabot, material and any other costs incident to performing the <br /> Work . <br /> Page 4 of 26 <br /> March 16, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.