Laserfiche WebLink
Indian River County Department of Utilities <br />Project: WILDWOOD SUBDIVISION <br />Description: FURNSIH AND INSTALL WATER DISTRIBUTION SYSTEM <br />Last Updated: April 14, 2003 <br />Bid <br />Bid <br />Bid Item <br />Estimated <br />Quantity <br />Unit of <br />Measure <br />Unit <br />Price <br />Total <br />Price <br />Item 9 <br />Item <br />Description <br />MOBILIZATION <br />1 <br />Mobil <br />Mobilization <br />1 <br />L.S. <br />53.000.00 <br />53.000 <br />WATER DISTRIBUTION <br />2 <br />WM-PVC 2 <br />Furnish & Install 6 -inch PVC Water Main <br />860 <br />LF <br />518.00 <br />515.480 <br />3 <br />HDD / 6 -inch <br />Furnish & Install 6 -inch HDPE Horizontal Directional Drill <br />50 <br />LF <br />555.00 <br />S2.300 <br />4 <br />DB / 6 -inch <br />6" Driveway Bore <br />100 <br />LF <br />540.00 <br />54.000 <br />5 <br />FIT 1 <br />Furnish & Install - Mech. Restrained Jt. Ductile iron Fittings <br />0.04 - <br />Tons <br />53.000.00 <br />S1-13 <br />6 <br />FIT 2 <br />Make connection to Exist Mains/ Structure (Tapping Sleeve and Valve) <br />1 <br />EA <br />52,500.00 <br />52.500 <br />7 <br />FIT 3 <br />Temp. Water Main Jumper <br />1 <br />EA <br />5800.00 <br />5800 <br />8 <br />WS - sel. / short <br />Water Service line - Single Short <br />6 <br />EA. <br />S500.00 <br />53.000 <br />WS - sgl. / long <br />Water Service line - Single Lone <br />6 <br />EA. <br />5850.00 <br />55.100 <br />WS - dbl. / short <br />Water Service line - Double Short <br />0 <br />EA. <br />5600.00 <br />SO <br />WS - dbl. / lone <br />Water Service line - Double Long <br />1 <br />EA. <br />51.050.00 <br />51.050 <br />9 <br />FHA <br />Fire Hydrant Assembly w/ 6 -inch gate valve <br />2 <br />EA <br />52.500.00 <br />55.000 <br />LANDSCAPE RESTORATION <br />v _ .. .: +•- %:m .. - <br />10 <br />Sod <br />Lawn Restoration (Topsoil & Sod) (estimated 9' wide replacement) <br />573 <br />S.Y. <br />55.00 <br />53:867 <br />DEMOBILIZATION <br />11 <br />Demob. <br />Demobilization <br />I <br />L.S. <br />5500.00 <br />5500 <br />12 <br />RD <br />Record Drawines <br />1 <br />L.S. <br />5500.00 <br />S500 <br />Sub -Total <br />546.710 <br />10%Contineencv <br />54.671 <br />Total Est. Construction Cost : <br />S56,381 <br />Surveying Services : <br />50 <br />Desitnt Services (2l <br />7.00% <br />53.597 <br />Permit Fee - FDEP Water <br />1 <br />LS <br />S500.00 <br />5500 <br />Pemiining Services @ <br />0.50% <br />5257 <br />Bidding & Award Services @ <br />0.75% <br />5335 <br />Services During Construction (2) <br />2.00% <br />.51..0 18 <br />Administration ( <br />2.50% <br />51.285 <br />ESTIMATED ASSESSED PROJECT COST : S58,432 <br />c:/Jeremiah Johnson projects/Project -Dixie Heights/Wildwood Water Assessment - Cost-Est.xls/CONSTRUCTION COST <br />ATTACHMENT 3 <br />Page 1 <br />