My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/1/1976
CBCC
>
Meetings
>
1970's
>
1976
>
12/1/1976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:28:20 AM
Creation date
6/10/2015 4:34:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/01/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM II - 17TH STREET OVERHEAD DISTRIBUTION <br />This item includes all work associated with the adjustment of the over- <br />head distribution system located at the 17th Street and US -1 intersection and <br />along or adjoining 17th Street from US -1 east to the Indian River, with the <br />exception of distribution work associated with the relocation of transmission <br />structures under Item I above. <br />There is an existing 13,200 volt double circuit wood pole and crossarm <br />type line with a static wire and one neutral conductor located on the north <br />side of 17th Street. These circuits are known as the West Feeder, circuit <br />No. 13-0101 and the South Plant Tie Line, circuit No. 13-0107 and originate <br />at riser poles located in front of the Power -Plant. The static wire is 3 <br />No. 8 Alumoweld and the circuit 13-0101 conductors, on the top crossarm, are <br />336 MCH, 18/1 aluminum conductor, steel reinforced (ASCR). The 13-0107 con- <br />ductors are 394.5 MCM, 19 strand AAAC. The neutral is 3/0 AWG, 6/1 ACSR. <br />The work on these circuits consists of the replacement of several wood <br />pole structures at the US -1 intersection with concrete pole structures using <br />horizontal post insulators and the transfer of the existing conductors and <br />other facilities to the new structures. Some work is required on a 4,160 volt <br />line located on US -1 at 17th St. At the 6th Avenue intersection with.17th <br />Street one double circuit structure will be replaced with a similar wood <br />structure. At the power plant end of the double circuit line, one new con- <br />crete structure and new concrete riser poles with steel crossarms will be <br />installed, the existing wood structures removed and the conductoro transferred <br />or spliced out as required. <br />A third three-phase, 13,200 volt circuit, the South Beach Feeder, Circuit <br />No. 13-0105 will require replacement of an existing wood riser structure near <br />the power plant with a new concrete structure and the splicing out of existing <br />394.5 MCM, 19 strand AAAC conductors and a 4/0 AWG, 19 strand AAAC neutral. <br />p <br />0 <br />355 <br />DEC <br />11976��,- <br />
The URL can be used to link to this page
Your browser does not support the video tag.