My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/21/1979
CBCC
>
Meetings
>
1970's
>
1979
>
3/21/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:38 AM
Creation date
6/11/2015 11:03:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/21/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ � v <br />1. SCHEMATIC DESIGN OF MODIFICATIONS AND SITE <br />•a <br />WORK FOR THE FOLLOWING BUILDINGS: <br />a. Old Indian River Memorial Hospital Building <br />b. Indian River County Courthouse Building <br />c. Courthouse Annex Building <br />FOR USE AS ADMINISTRATIVE AND COURT -SPACES BY <br />THE COUNTY, AND OTHER AGENCIES INCLUDING°THE <br />COUNTY SCHOOL BOARD. <br />Schematic Design will include the following: <br />1.1 The Architect will review the Space Program <br />prepared by it as a part of the Facilities Plan • <br />with all the agencies planned to be located in <br />these building and obtain necessary design <br />guidelines and review understanding of such <br />requirements with.the Owner. <br />1.2 The Architect will evaluate and review with the <br />Owner alternative approaches to design and con- <br />struction of modifications to these buildings. <br />1.3 The Architect will prepare, for approval by the <br />Owner, Schematic Design Documents consisting of <br />drawings and other documents illustrating the <br />scale and relationship of all components to be <br />located in these buildings based on the Space <br />Program and the Project budget requirements. <br />2. AS BUILT DRAWINGS OF EXISTING FACILITIES: <br />The.Architect will provide services to investigate <br />existing conditions in the above mentioned <br />County buildings or, to make measured drawings <br />thereof, or to verify the accuracy of drawings <br />furnished by the Owner. <br />III. PERIOD OF SERVICE <br />K <br />A. The ARCHITECT will begin to work promptly after re- <br />ceipt of a fully executed copy of this Agreement; such receipt <br />shall constitute written notice to proceed. Development of the <br />Schematic Plan is scheduled to be completed within eight (8) <br />weeks of notice. <br />IV. METHOD OF COMPENSATION <br />A. TIME CHARGES. The OWNER agrees to compensate the <br />ARCHITECT for the professional services called for under this <br />•ti Agreement by taking the direct salary expense of all those <br />persons engaged directly on the ONWER'S work and adding a sur- <br />charge of 187 percent for overhead and profit for time <br />directly chargeable to the project. Average direct Salary <br />expense shall not exceed the amounts shown on the following <br />schedule: <br />-2- <br />800K 39 PAGE 338 `m <br />MAR 2 11979 <br />
The URL can be used to link to this page
Your browser does not support the video tag.