My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/19/1980
CBCC
>
Meetings
>
1980's
>
1980
>
3/19/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:52 AM
Creation date
6/11/2015 11:19:22 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/19/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HE AND ENGINEER JOHN ROBBINS MET WITH CITY MANAGER .JOHN LITTLE, CITY <br />UTILITY DIRECTOR ELLIOTT GROSH, AND CITY FINANCE DIRECTOR TOM MASON, <br />AND CAME TO THE UNDERSTANDING THAT WE COULD PROCEED WITH USING THAT <br />FORCE MAIN BEFORE THE METER WAS INSTALLED, ESSENTIALLY UNDER THE <br />TERMS AND CONDITIONS THAT WILL BE IN THE COMBINED AGREEMENT. HE <br />BELIEVED THE CITY HAS AGREED THERE IS A MEANS OF METERING THE FLOW AND <br />THAT WE CAN GO AHEAD AND DO IT. <br />CHAIRMAN SIEBERT STILL FELT SOMETHING HAS TO BE IN WRITING. <br />MR. LINER NOTED THAT HE HAS HIS MEMO AND THE RESULTS OF THAT <br />MEETING AND FELT FOR THE CHAIRMAN'S PURPOSES, WE COULD HAVE THE CITY <br />AND COUNTY SIGN THOSE DOCUMENTS, WHICH ARE AS FOLLOWS: <br />MEMORANDUM <br />TO: Developers <br />FROM: G. Liner j �-- <br />SUBJECT: Status of 6th Avenue Force Main <br />DATE: February 15, 1980 <br />Before any developers can tie onto the force main from <br />Vero Mall to the Vero Beach treatment, there are a series of <br />events which are planned to be completed. Some of these are <br />out of my control, but others are being urged to be brought <br />to a head. .These events include the following: <br />1. Vero Beach requires installation of a special sewage meter <br />to determine the volume of treatment from the force main. <br />This meter has been ordered and will be delivered and <br />installed about eleven to fifteen weeks from now. That <br />will be some time in May. <br />2. A plan is being drawn up by Beindorf and Associates to <br />offer maximum hydraulic use up to the 600,000 gallons <br />per day capacity of the main and Vero Beach treatment <br />allocation. Specific nodes (loading points) are being <br />planned for flow and pressure parameters that offer the <br />most practical approach. <br />3. Wholesale rates must be defined by Vero Beach that will <br />give us a basis to come to a firm rate for service that <br />we can tell the customers. Vero Beach is still evaluating <br />the audit by which the treatment rate will be figured. <br />They expect to have this information shortly. <br />33 <br />MAR 19 19 80 - soon 3 WE' -33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.