My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/9/1980
CBCC
>
Meetings
>
1980's
>
1980
>
4/9/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:52 AM
Creation date
6/11/2015 11:21:00 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/09/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PR 91994 _ Boos 43 Pao 237 <br />TH�.BOARD NEXT REVIEWED THE FOLLOWING MEMO WRITTEN TO <br />THE ADMINISTRATOR BY SENIOR PLANNER DAVID MARSH IN REGARD TO OB- <br />TAINING ADDITIONAL ENGINEERING SERVICES FOR THE WABASSO REACH PARK <br />PROJECT: <br />INDIAN■ <br />PuNdLAANNr } <br />OERARTIVIENT <br />March 19, 1980 <br />MEMO <br />TO: Jack <br />pG..� Jennings, County Administrator <br />FROM: Dared,arsh, Senior Planner <br />SUBJECT: Engineering Services for Wabasso Beach Pi <br />It has become apparent that the development of the Wabasso Beach Project <br />will take an extensive amount of additional time and resources to imple- <br />ment and complete this construction program. There is currently a pressing <br />need to come up with a viable program schedule delineating contractual/non- <br />contractual services, work assignments and schedules, material estimates <br />and acquisition methods, as well as management procedures. <br />The attached "Program Schedule" gives an idea of the varying tasks which <br />need to be accomplished with suggested coordination and supervision assign- <br />ments. This is a very brief outline of the overall program, and as can be <br />seen, does not really address the extensive amount of detail work that will <br />be required. <br />As a means of developing a viable implementation, construction and manage- <br />ment program, we have discussed with Neil Nelson and Jim Beindorf the <br />possibility of obtaining consulting services to supplement our staff's <br />efforts. Although the overall program could possibly be accomplished "in <br />house", the workload in this_ offi.ce,and apparently with Neil and Wilson <br />also, would sever <br />ely-°limit our effectiveness in expediting the the overall <br />project. I also believe that without a good detailed program schedule that <br />we would also have a --lot of problems in coordination and management. <br />It is for this reason that I would like to request that we extend our con- <br />tractual agreement with Beindorf and Associates to allow for consulting <br />services to be provided in -the same manner as was done for the "Drainage <br />Ordinance" review procedures. The June, 1972 agreement between Beindorf <br />and the County could provide for necessary supplemental services to include <br />the following: <br />SUGGESTED SCOPE - WABASSO BEACH PARK DEVELOPMENT <br />1) Provide technical and general consultation to the Planning and <br />Administrator's Departments when requested. <br />2) Perform limited engineering or inspection services on construction <br />and related project matters. <br />DAVID M. REVER • DIRECTOR <br />212114TH ;ZvE. VERO BEACH, FL 32960 • 305/567-5142 <br />I� J <br />
The URL can be used to link to this page
Your browser does not support the video tag.