My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/23/1980
CBCC
>
Meetings
>
1980's
>
1980
>
4/23/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:52 AM
Creation date
6/11/2015 11:23:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/23/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r' <br />-APR 2 31980 poi 43 pAcE372 <br />WAIVE THE DRILLER S SIGNATURE REQUIREMENT THROUGH THE BIDDING <br />PROCESS, WITH THE DRILLER TO BE DETERMINED AS A RESULT OF THE <br />BIDDING PROCESS. THEY ALSO ASKED THAT WE SUBMIT THE WATER USE <br />PERMIT APPLICATION ALONG WITH THIS. MR. TESSIER EXPLAINED THAT <br />THE NORMAL PROCEDURE OF THE WATER MANAGEMENT DISTRICT IS THAT THEY <br />WILL ISSUE A WATER USE PERMIT FOR UP TO TEN YEARS; SO, IT WAS FELT <br />WE SHOULD START OUT BY ASKING FOR THE MAXIMUM PERIOD. THIS APPLI- <br />IV <br />CATION HAS BEEN PREPARED, AS WELL AS APPLICATIONS COVERING THE TWO' <br />PRODUCTION WELLS AS IN THE $PECIFICATIONS. MR. TESSIER THEN DIS- <br />CUSSED THE LETTER OF WAIVER WHICH HE HAD DRAFTED TO BE SENT TO THE <br />WATER MANAGEMENT DISTRICT. <br />MR. ENG EXPLAINED THAT THEY WANT TO PROCEED WITH THE WATER <br />USE PERMIT APPLICATION BECAUSE IT TAKES THE STAFF A MINIMUM OF 90 <br />DAYS TO REVIEW IT, AND THEREFORE, IF THIS WERE SUBMITTED AT THE <br />END OF THE TEST WELL PROGRAM, IT WOULD BE AT LEAST THE FIRST OF <br />THE YEAR BEFORE WE COULD GET THE WATER USE PERMIT. <br />ON MOTION BY COMMISSIONER WODTKE, SECONDED BY COMMISSIONER <br />LYONS, THE BOARD UNANIMOUSLY ACCEPTED THE SPECIFICATIONS AND PLANS <br />FOR THE CONSTRUCTION OF THE FLORIDAN AQUIFER PRODUCTION WELLS AND <br />CONSTRUCTION WORK AS SUBMITTED BY GERAGHTY & MILLER AND SUMMARIZED <br />BY THE .JOINT VENTURE IN A LETTER DATED APRIL 15, 1980, AS AMENDED <br />BY THE CONSULTANTS, UTILIZING TEST PROGRAM ALTERNATIVE N0. 2, AND <br />AUTHORIZED THE BID ADVERTISEMENT. <br />ON MOTION BY COMMISSIONER Loy, SECONDED BY COMMISSIONER <br />DEESON, THE BOARD UNANIMOUSLY AUTHORIZED THE ADMINISTRATOR TO SIGN <br />THE APPLICATION FOR THE CONSUMPTIVE USE PERMIT, THE APPLICATIONS FOR <br />TWO WELL CONSTRUCTION PERMITS, AND THE LETTER TO ST. .JOHNS RIVER <br />WATER MANAGEMENT DISTRICT REQUESTING WAIVER OF DISTRICT PROCEDURES. <br />COPY OF SAID LETTER IS HEREBY MADE A PART OF THE MINUTES. <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.