My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/21/1980
CBCC
>
Meetings
>
1980's
>
1980
>
5/21/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:53 AM
Creation date
6/11/2015 11:27:47 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/21/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMISSIONER DEESON REITERATED THAT HE BELIEVED WE COULD <br />GET A LOT MORE FOR A LOT LESS IF COUNTY CREWS COULD DO THE WORK, BUT <br />STATED THAT HE WAS NOT OPPOSED TO GETTING BIDS. <br />SENIOR PLANNER MARSH COMMENTED THAT THERE ARE TWO COUNTY <br />CARPENTERS WHO COULD WORK ON THIS, BUT THEY ARE CURRENTLY WORKING ON <br />THE COUNTY ADMINISTRATION BUILDING AND ON REPAIR OF BRIDGES. HE <br />NOTED THAT THEY DID PAD THEIR ESTIMATES TO ALLOW FOR INFLATION AS BEST <br />THEY COULD, AND HE FELT THEY WENT WITH PRETTY HIGH FIGURES. <br />CHAIRMAN SIEBERT ASKED IF WE NEED TO ADVERTISE FOR BIDS OR <br />WHETHER WE COULD JUST OBTAIN PROPOSALS, AND IT WAS NOTED THAT PROJECTS <br />UNDER DISCUSSION INVOLVE $30,000 TO $40,000. IT WAS AGREED THAT WE <br />SHOULD GO TO BID. <br />ON MOTION BY COMMISSIONER DEESON, SECONDED BY COMMISSIONER <br />Loy, THE BOARD UNANIMOUSLY GAVE CONCEPTUAL APPROVAL OF THE TIME <br />SCHEDULE FOR THE DEVELOPMENT OF WABASSO BEACH PARK AS OUTLINED BY <br />SENIOR PLANNER MARSH; AUTHORIZED ADVERTISING FOR BIDS ON THE RELIEF <br />STATION, GAZEBO, BOARDWALK, TWO CROSSOVERS AND THE NECESSARY UTILITIES <br />CONSTRUCTION; AUTHORIZED THE ROAD & BRIDGE DEPARTMENT TO PROCEED <br />UNDER THE ABOVE SCHEDULE ON A PRIORITY BASIS WITH PRIMARILY THE BLUFF <br />LINE WORK; AND AUTHORIZED THE SPENDING OF APPROXIMATELY $4,000 FOR <br />SEEDLINGS AND MATERIALS NECESSARY TO STABILIZE THE BLUFF LINE. <br />CHAIRMAN SIEBERT INFORMED THE BOARD THAT AFTER THE BOARD'S <br />JOINT MEETING WITH THE ZONING BOARD LAST WEEK, THE PLANNING DEPARTMENT <br />REQUESTED THAT THE CHAIRMAN OF THE TWO BOARDS GET TOGETHER AND GIVE <br />THEM SOME IDEA OF WHICH DIRECTION THEY SHOULD PROCEED WITH DEVELOPMENT <br />OF THE COMPREHENSIVE LAND USE PLAN. HE CONTINUED THAT PLANNING <br />DIRECTOR REVER HAS PREPARED A MEMO WHICH DOES AN EXCELLENT JOB OF <br />SETTING OUT WHAT WAS DISCUSSED AT THAT MEETING AND IF WE ELECT TO <br />PROCEED ON THE BASIS SET OUT IN HIS MEMO, IT WILL BE PRESENTED TO THE <br />PLANNING & ZONING COMMISSION TOMORROW, SAID MEMO IS AS FOLLOWS: <br />MAY 211980 <br />
The URL can be used to link to this page
Your browser does not support the video tag.