My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/25/1980
CBCC
>
Meetings
>
1980's
>
1980
>
6/25/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:53 AM
Creation date
6/11/2015 12:08:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/25/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR. KONTOULAS CONTINUED THAT HE HAS ANOTHER COST FIGURE IN- <br />VOLVING THE EXISTING GENERATOR AT THE NEW COUNTY ADMINISTRATION BUILD- <br />ING. THIS IS NOT A CHANGE ORDER PROPOSAL BECAUSE THE WAY THE SPECS <br />WERE WRITTEN, THE OWNER HAS TO UPGRADE THE GENERATOR AND MAKE SURE IT <br />WORKS. MR. KONTOULAS REPORTED THAT HE HAS DISCUSSED WITH TAMPA ARMA- <br />TURE THE DIFFERENT THINGS THE OWNER WOULD HAVE TO DO WITH THE GENERATOR, <br />AND HE IS IN AGREEMENT WITH EVERYTHING THEY SUGGESTED. HE THEN DIS- <br />CUSSED THE PRICE FOR AN EXERCISE CLOCK, OR AUTOMATED TIME CLOCK, WITH <br />WHICH THE GENERATOR CAN BE TURNED ON AUTOMATICALLY ONCE OR TWICE A <br />WEEK TO KEEP THE MOTOR IN GOOD CONDITION AND THE BATTERIES CHARGED, <br />HE NOTED THIS IS A DIESEL ENGINE, AND THE DIESEL FUEL MUST BE KEPT <br />WARM. MR, KONTOULAS THEN EXPLAINED THAT THE EXISTING FUEL TANK, <br />WHICH IS BURIED, HAS EXISTING COPPER LINES, BUT THE TANK AND THE <br />GENERATOR ARE TOO FAR APART, AND IT COULD REQUIRE SEVERAL MINUTES FOR <br />THE FUEL TO REACH THE GENERATOR. DISTANCE IS CRUCIAL BECAUSE YOU <br />WANT THE GENERATOR ON IN A HURRY; THEREFORE, A VOLTAGE REGULATOR IS <br />A MUST. THE COST FOR ALL OF THIS IS $3,874. <br />MR. KONTOULAS NEXT REPORTED THAT WE DID RECEIVE THE SECOND <br />REQUEST FOR PAYMENT ON THE ADMINISTRATION BUILDING AND THE FIRST ON <br />THE COURTHOUSE AND GAVE THE FIGURES ON THE AMOUNTS PAID AND THE RE- <br />TAINAGE. HE THEN PROCEEDED TO GIVE THE BOARD A HISTORY OF WHAT HAS <br />BEEN ACCOMPLISHED. ON THE THIRD FLOORDEMOLITION IS COMPLETE; ALL <br />NEW STUDS HAVE BEEN ERECTED; ELECTRICAL WIRING HAS BEEN INSTALLED; <br />AND TELEPHONE STREAMS HAVE BEEN PULLED TO THE TELEPHONE CABINET. <br />ON THE SECOND FLOOR, THE ELECTRICIANS ARE PULLING WIRE NOW; THE STUDS <br />ARE COMPLETE; AND THAT IS WHY THE ROOF IS SO IMPORTANT BECAUSE NOTHING <br />CAN BE DRYWALLED UNTIL THE ROOF IS DONE. ON THE FIRST FLOOR DEMOLI- <br />TION HAS BEEN ACCOMPLISHED IN QUITE A FEW AREAS. MR. KONTOULAS COM- <br />MENTED THAT GOOD PROGRESS HAS BEEN MADE ON THE DEMOLITION; THE CON- <br />TRACTOR COULD USE MORE HELP BECAUSE THERE IS QUITE A RAPID TURNOVER <br />IN PERSONNEL. PLUMBING WORK HAS BEEN DONE; FOOTINGS HAVE BEEN POURED <br />FOR THE COMMISSION ROOM, HE FELT THEY ARE WELL ON SCHEDULE AND <br />SHOULD BE WITHIN 40 DAYS OF STARTING ON THE WEST END. DEMOLITION IS <br />ALSO PROCEEDING WELL AT THE COURTHOUSE. <br />63 <br />JUN 2 51980 <br />
The URL can be used to link to this page
Your browser does not support the video tag.