Laserfiche WebLink
_I <br />DEC 5 1980 Box 45 PAGE 415 <br />.ITEM 5 - MR. KONTOULAS STATED THAT HERE AGAIN THE ALUMINUM <br />DOOR HARDWARE WAS NOT COVERED IN THE HARDWARE SCHEDULE EXCEPT FOR <br />THE CYLINDERS. <br />ITEM 6 - FROM THE COMMISSION ROOM HALLWAY TO A CORRIDOR <br />ON THE WEST SIDE, WE HAVE TWO WINDOWS - ONE 6' AND ONE 2', AND THE <br />2' WINDOW THEY WANT TO BLOCK UP INTERFERES WITH THE AIR CONDITIONING <br />BECAUSE THE CEILING HAS TO BE MUCH LOWER AT THAT -POINT. ALSO, THE <br />FRAMING ON THE 6' WINDOW WAS NOT SPECIFIED IN THE DETAIL, AND THIS <br />IS A NECESSARY ITEM. MR. KONTOULAS RECOMMENDED APPROVAL OF CHANGE <br />ORDER #12. <br />MOTION WAS MADE BY COMMISSIONER BIRD, SECONDED BY COMMIS- <br />SIONER FLETCHER, TO APPROVE CHANGE ORDER #12 FOR THE COUNTY ADMINIS- <br />TRATION BUILDING AND AUTHORIZE THE SIGNATURE OF THE CHAIRMAN. <br />COMMISSIONER FLETCHER POINTED OUT THAT THE COVER SHEET ON <br />THE CHANGE ORDER STATES THAT THE CONTRACTOR WILL BE PAID FOR THE <br />ADDITIONAL REQUIRED DAYS AT THE RATE OF $300 PER DAY FOR FIXED OVER- <br />HEAD COSTS; HOWEVER, ON THE 9TH SHEET OF THE PACKET COMPRISING THIS <br />CHANGE ORDER, A LETTER FROM REINHOLD CONSTRUCTION TO THE ARCHITECT <br />SETS OUT THAT THE FIXED OVERHEAD COSTS ARE $400 PER DAY, WHICH IS NOT <br />CONSISTENT. SAID LETTER IS AS FOLLOWS: <br />10 <br />