Laserfiche WebLink
M <br />November fel-, 1980 <br />Connell, Metcalf & Eddy, Inc. <br />P. 0. Box 341939 <br />Coral Gables, F1. 33134 <br />Attn: Mr. F. Kirsch <br />Re: IN-1IAN RIVER, CCUt'lry <br />C!�11G11.G A! -,D. & R"t'!OV. <br />V_�o e;_,acll, rLOP!DA <br />Gentlemen: <br />In response to your Change Proposal No. Z7 _, the Contractor will provide <br />the changes pruposed in the work for an "lluunt of $2G, %9.59 A cost <br />sunrilary of this proposal is attached. _ � <br />To accomplish the proposed chances in the work try require 4 � additional <br />days of Contract Time. The fixed overhead costs associated with this <br />project are $A o: ccper day. Therefore, the total additional cost which ►-QJ <br />result from the, extended time required is which includes allow- <br />able general overhead and fee. <br />If you wish to make the proposed changes in the work please issue a change <br />order adjusting the Contract Sum and Time by the above amounts as soon as <br />possible to avoid or minimize any delays which may otherwise occur and <br />which would increase costs. This proposal is valid for j s days from <br />this date, after which it is subject to withdrawal and revision. <br />9 <br />Very truly yours, <br />REINHAOLD CONSTRUCTION, INC. <br />L. A. Snodgrass <br />V ce-f res i dent <br />MR. REINHOLD STATED THAT WAS A CLERICAL ERROR AND THE AMOUNT <br />SHOULD BE $400 PER DAY. <br />MR. KONTOULAS STATED THAT ANY CHANGE IN THE $300 FIGURE <br />WAS NEWS TO HIM. HE CONTINUED THAT HE HAD A DISCUSSION THURSDAY <br />IN MR. REINHOLD'S OFFICE, AND THE $400 FIGURE NEVER CAME UP; ALTHOUGH, <br />HE HAS SEEN IT ON CERTAIN CHANGE ORDERS AND HAS ASKED THE ARCHITECT <br />TO CLARIFY THIS. <br />11 <br />DEC 51980 <br />Bou 45 Fact- 416 <br />