My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. Concrete Encasement: Measurement of "Concrete Encasement" shall be on the <br />basis of each pipe encased in concrete, and shall include the excavation, temporary <br />shoring, placing of concrete around the pipe, backfill, compaction, restoration of <br />surface, and all else incidental thereto. The concrete encasement shall include the <br />number of cubic yards of concrete installed, based on a maximum allowable <br />quantity of concrete, as follows: <br />Pipe Size (Inches) Max. Concrete for Encasement <br />(CY/LF of Pipe) <br />6 0.09 <br />8 0.10 <br />10 0.11 <br />12 0.12 <br />Concrete Sidewalk and Driveway Replacement: Shall include sidewalk and/or <br />driveway removed and replaced as a result of Contractor's operations. Minimum <br />widths of replacement shall be as described in specifications or as shown on the <br />plans. No separate payment will be made for concrete construction, including saw <br />cutting, excavation, formwork, reinforcing, or other work or materials required in <br />connection with concrete construction. The cost of all concrete sidewalk and <br />driveway replacement shall be included in the unit price bid for the utility main. <br />K. Asphaltic Pavement Replacement: Shall include asphalt removed and replaced as a <br />result of Contractor's operations. Minimum width of replacement shall be as <br />described in the specifications or as shown on the plans. Work shall include saw <br />cutting, disposal of demo'd asphalt, and construction of the surface course, base, <br />subgrade materials, and pavement markings, testing and all else incidental thereto. <br />The cost of all asphaltic pavement replacement shall be included in the unit cost bid <br />for the utility main. <br />L. Unimproved Driveway Replacement: Shall include (dirt, marl, shell, or gravel) <br />driveway replacement/reconstruction removed and replaced as a result of the <br />construction operations. Work shall include subgrade and surface (shell, marl, <br />gravel) materials, compaction, density testing, etc. Unimproved driveway <br />replacement shall be included in the unit cost bid for the utility main. <br />M. Grassing: Shall include grassing (sod) along the water main pipe, of all grassed areas <br />disturbed and restored as a result of Contractor's operations. The entire width of <br />the disturbed area shall be grassed. The work shall include all necessary grading, <br />soil preparation, sodding, fertilizer, mulch, and irrigation. Grassing shall be included <br />in the unit price bid for the utility main. <br />N. Connect to Existing: Measurement of "Connect to Existing" shall include the <br />installation / connection of the new or replacement utility main to the existing <br />utility main, and shall include the cost of the "Tapping Sleeve and Valve" when <br />depicted or called for in the plans and listed and included in the bid item, and for all <br />additional work and materials required for the connection including excavation and <br />'93toym <br />
The URL can be used to link to this page
Your browser does not support the video tag.