2 <br />3. <br />El <br />assemblies, reinforcement, or side forms. Use only square -faced shovels <br />for hand -spreading and consolidation. Consolidate with care to prevent <br />dislocation of reinforcing, dowels, and joint devices. Do not use vibrators <br />to push or move concrete in forms or chute. <br />Deposit and spread concrete in a continuous operation between <br />transverse joints, as far as possible. If interrupted for more than one-half <br />hour, place a construction joint. <br />Curbs and Gutters: Automatic machine may be used for curb and gutter <br />placement at Contractor's option. If machine placement is to be used, <br />submit revised mix design and laboratory test results which meet or <br />exceed the minimum herein specified. Machine placement must produce <br />curbs and gutters to the required cross-section, lines, grades, finish, <br />and jointing as specified for formed concrete. If results are not <br />acceptable, remove and replace with formed concrete as specified. <br />Joints: Construct expansion, weakened -plane (contraction), and <br />construction joints true -to -line with face perpendicular to surface of the <br />concrete, unless otherwise indicated. Construct transverse joints at right <br />angles to the centerline, unless otherwise indicated. When joining <br />existing structures, place transverse joints to align with previously -placed <br />joints, unless otherwise indicated. <br />a• Weakened -Plane Joints: Provide weakened -plane (contraction) <br />joints sectioning concrete into areas where required. Construct <br />weakened -plane joints for a depth equal to at least one-quarter <br />concrete thickness, by sawing within 24 hours of placement or <br />formed during finishing operations. Place joints at intervals not <br />to exceed 10 feet, if not otherwise indicated. <br />b• Construction Joints: Place construction joints at the end of all <br />pours and at locations where placement operations are stopped <br />for a period of more than one-half hour, except where such pours <br />terminate at expansion joints. Construction joints shall be as <br />shown or, if not shown, use standard metal keyway -section form <br />of appropriate height. <br />C. Expansion Joints: <br />(1) <br />Provide premolded joint filler for expansion joints <br />abutting concrete curbs, <br />catch basin, manholes, inlets, <br />structures, walks, and other fixed objects, <br />unless <br />otherwise indicated. <br />(2) <br />Locate expansion joints at 30 feet o.c. for concrete walks, <br />unless otherwise indicated. <br />(3) <br />Extend joint fillers full width and depth of joint, and not <br />less than one-half inch below finished surface where joint <br />sealer is indicated. If no joint sealer, place top of joint <br />filler flush with finished concrete <br />(4) <br />surface. <br />Furnish joint fillers in one-piece lengths for the full width <br />being placed, wherever possible. Where more than one <br />length is required, lace or clip joint filler sections <br />together. Pieces shorter than four inches <br />shall not- be <br />02576-6 <br />