My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/3/1981
CBCC
>
Meetings
>
1980's
>
1981
>
6/3/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:09:29 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/03/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMISSIONER FLETCHER COMMENTED THAT DURING BUDGET HEARINGS <br />$50,000 WAS INCLUDED IN THE ROAD & BRIDGE BUDGET FOR HALF A WAREHOUSE. <br />THIS PROPOSAL IS FOR EQUIPMENT SHEDS TO GO AROUND THE PERIMETER OF THE <br />YARD SO THAT ALL THE EQUIPMENT SITTING IN THE WEATHER CAN BE COVERED; <br />THE FUNDS FOR THESE WILL BE TAKEN FROM THE MONEY SET ASIDE FOR THE <br />HALF WAREHOUSE. COMMISSIONER FLETCHER FAVORED THE BUILDING OF THE OPEN <br />EQUIPMENT SHEDS AND FELT THEY WOULD SHELTER THE EQUIPMENT AND PROVIDE <br />MORE FREEDOM AND FLOW THAN AN ENCLOSED WAREHOUSE, <br />ENGINEER DAVIS REPORTED THAT THE PROPOSED STRUCTURES, WHICH <br />WILL HAVE NO WALLS ON ALL FOUR SIDES, ARE BUILT WITH POLES SUPPORTING <br />A PITCHED ROOF AND WILL BE SET ON A REINFORCED CONCRETE SLAB FOOTING. <br />DISCUSSION FOLLOWED AS TO THESE BUILDINGS BEING CONSTRUCTED <br />IN LIEU OF THE BIG WAREHOUSE, AND ADMINISTRATOR NELSON EXPLAINED THAT <br />THEY REWORKED THE PROJECT AND DECIDED TO GO THIS WAY INSTEAD. HE THEN <br />REVIEWED THE BIDS, NOTING THAT THEY WENT TO FOUR LUMBER COMPANIES AND <br />THREE TRUSS COMPANIES. THE CONCRETE WILL BE SUPPLIED BY RUSSELL CON- <br />CRETE, WHO WAS AWARDED OUR ANNUAL BID. <br />DISCUSSION CONTINUED RE DESIGN, AND ENGINEER DAVIS INFORMED <br />THE BOARD THAT THE CONSTRUCTION OF THE SHELTERS HAD TO BE UPGRADED TO <br />SOME DEGREE TO ALLOW FOR HURRICANE WIND LOADING. THE BOARD AGREED AS <br />TO THE ADVISABILITY OF HAVING A CONCRETE FLOORING. <br />ON MOTION BY COMMISSIONER BIRD, SECONDED BY COMMISSIONER <br />SCURLOCK, THE BOARD UNANIMOUSLY ACCEPTED THE ADMINISTRATORS RECOMMENDA- <br />TION RE MATERIALS FOR CONSTRUCTION OF STORAGE SHELTERS AT THE COUNTY <br />ROAD AND BIRDGE COMPLEX AS SET OUT IN HIS MEMO OF MAY 19TH; FUNDING <br />TO BE FROM ACCOUNT #102-214-541-66.29. <br />FINAL APPROVAL - SEA GROVE SUBDIVISION. UNIT 6 <br />ENGINEER DAVIS NOTED THAT THE SEA GROVE PROJECT HAS BEEN <br />CARRIED OUT IN UNITS, AND THIS SHOULD WRAP UP THE DEVELOPMENT AS <br />EXPLAINED IN THE FOLLOWING MEMO. THIS PARTICULAR UNIT IS IN THE NORTH- <br />WEST CORNER OF THE PROPERTY RIGHT ON S.R. AlA, <br />JUN 3 7981 65 c4-� 46 PAGE635 <br />
The URL can be used to link to this page
Your browser does not support the video tag.