My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01200 <br />PROJECT MEETINGS <br />PART1 — GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. The Engineer shall schedule and administer pre -construction meeting, periodic <br />progress meetings and specially called meetings throughout progress of the work. <br />1. Prepare agenda for meetings. <br />2. Make physical arrangements for meetings. <br />3. Preside at meetings. <br />4. Record the minutes; include significant proceedings and decisions. <br />5. Reproduce and distribute copies of minutes within 15 working days after each <br />meeting. <br />a. To participants in the meeting. <br />b. To parties affected by decisions made at the meeting. <br />B. Representatives of Contractors, Subcontractors and suppliers attending meetings <br />shall be qualified and authorized to act on behalf of the entity each represents. <br />C. Attend meetings to ascertain that work is expedited consistent with Contract <br />Documents and construction schedules. <br />1.02 RELATED REQUIREMENTS <br />A. Instructions to Bidders are included in Section 00100. <br />B. Construction Schedules are included in Section 01311. <br />C. Shop Drawings, Working Drawings and Samples are included in Section 01300. <br />D. Contract Closeout is included in Section 01700. <br />1.03 PRE -CONSTRUCTION MEETING <br />A. Schedule a preconstruction meeting no later than 15 days after date of Notice to <br />Proceed. <br />B Location: A central site, convenient for all parties, designated by the Owner. <br />C. Attendance <br />1. Owner's Representative. <br />2. Engineer and his/her professional consultants. <br />3. Resident Project Representative. <br />4. Contractor's Superintendent, <br />5. Major Subcontractors. <br />6. Major suppliers. <br />7. Utilities <br />3. Others as appropriate. <br />01200-1 <br />DADIVISION 1\01200 Project Meetings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.